BAE's core platform is expected to weigh 53 tons and is designed to still meet mobility requirements at a gross weight of 75 tons, said Signorelli.
BAE系统公司的核心平台,预计重量53吨,其设计还满足了总重75吨的流动性要求。
The project started out with a Ph.D candidate, Riccardo Signorelli, using tweezers to put tiny squares of aluminum into a vacuum chamber and then pumping in a hydrocarbon gas.
这个项目是由博士研究生richccardoSignoreli首创的,他用镊子把正方形的小块铝片放到真空室中,然后鼓入烃气。
The project started out with a Ph.D candidate, Riccardo Signorelli, using tweezers to put tiny squares of aluminum into a vacuum chamber and then pumping in a hydrocarbon gas.
这个项目是由博士研究生richccardoSignoreli首创的,他用镊子把正方形的小块铝片放到真空室中,然后鼓入烃气。
应用推荐