• The degree of Shothole utilization ratio in construction of hard-rock tunnel has relation to project advance rate and cost of the tunnel.

    硬岩隧道施工炮眼利用率大小关系着隧道的工程进度工程成本

    youdao

  • In order to spread this technique, I have made trial VSP modeling during shothole drilling: shallow seismic velocity survey during shothole drilling.

    为了应用和推广一新技术,我们了随VSP模拟试验,即地表浅层炮井随钻地震速度测量

    youdao

  • In order to spread this technique, I have made trial VSP modeling during shothole drilling: shallow seismic velocity survey during shothole drilling.

    为了应用和推广一新技术,我们了随VSP模拟试验,即地表浅层炮井随钻地震速度测量

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定