In foundation excavating, upright post piles and engineering piles form a long -short pile composite foundation.
在基坑工程中,立柱桩和工程桩形成了长短桩复合桩基础。
The length of short pile is decided by soft soil strength of short pile tip in terms of analysis on bearing capacity of short pile.
在分析短桩加固区承载力内涵的基础上,提出了短桩长度由桩端处软土强度决定的设计标准。
In view of the effective working lengths of pile bodies in ground treatment, an analysis is carried out on the work mechanism of long and short piles.
基于桩体在地基处理中的有效工作长度对长短桩的工作机理进行了分析。
Composite pile foundation with long and short piles is a new kind of pile foundation. It is necessary to study the bearing mechanics and working behavior.
长短桩组合桩基础作为一种新型的桩基形式,对其承载性状、工作机理的研究很有必要。
As a combination of long and short pile foundations, the pile length and pile diameter were the factors that had great impact on vertical bearing capacity.
对于长短组合桩基而言,长短桩的桩长、桩径等因素对其竖向承载性能均有较大影响。
In multi-layer residential construction and office building, the rigid-flexible long-short pile composite found was feasible, and its economical efficiency was also significant.
多层住宅、多层办公楼等小跨度的层数不高的工程采用刚柔性长短桩复合地基技术是可行的,其经济性能也是可观的。
The determination of process parameters of short pile production with raising machine are discussed. The relationship between the quality of pile face and the service life of equipment is expounded.
论述了短毛绒起毛工艺参数的确定依据,以及它对绒面质量和设备使用寿命的关系。
But in the short run, credit was an easy way to prop up the living standards of those at the bottom of the economic pile.
但是从短期来看,要想支持落在经济收入队尾的人们的生活水平,信贷是一条捷径。
However, my commute is probably easier than most, since I live just a short distance to work and am able to avoid traffic pile-ups and stress.
尽管如此,我的出行会应该会比大多数其他人容易些。因为我住在离办公地点比较近的地方,能够避免交通的连环撞车事故和压力。
When you are trying to plow through a long pile of work, taking short breaks is a must as it helps you clear your mind, improve your focus and give your tired brain a rest.
当你努力处理一大堆工作、中间短暂休息几次是很必要的,这能帮助你清理你的大脑,提高你的集中力,让你疲惫的大脑放松一下。
Based on the application of post grouting technique in the rigid pile composite foundation, the authors investigated the mechanism of the capacity increase of short rigid pile by this technique.
结合后注浆技术在刚性桩复合地基工程中的应用,探讨后注浆技术提高刚性短桩承载力的作用机理。
When the elastic modulus of the short-pile is bigger, adapting the elastic modulus of the long-pile to adjust load share is better than that when the elastic modulus of the short-pile is smaller.
当短桩为高模量刚性桩时采用调整长桩弹性模量的方法来调节桩土的荷载分担的效果要比短桩为低模量柔性桩时稍佳。
The Strength Reduction Finite Element Method is applied to test whether the sliding face cross over the pile with the short anti-side piles.
运用有限元强度折减法对设置抗滑短桩后,对滑面是否越过桩顶进行了验证。
The current standard mainly establishes at the aim of short intermediate pile, the design method of the long and large diameter bored piles is less targeted and its applicability is not wide.
当前的规范主要是针对中短桩建立而成的,对于超长大直径钻孔灌注桩的设计,其针对性不强,存在适应性问题。
It has become a theoretical and engineering concern at the summit, to study long-short-pile composite foundation working mechanism.
长短桩复合地基工作性状研究,已逐步成为理论和工程界关注的热点。
Printing of paper placed before the time is too short, paper stacked pile heavy pressure is too high, it will take electrostatic paper.
印刷之前的纸张置放时间太短、纸叠堆压过高过重,也会引起纸张带静电。
It was concluded through analyze that the long pile is more economical and reasonable than short ones.
经分析表明,长桩比短桩相对更为经济合理。
Every once in a pile on the cable car, fast, and in a short while, in the foothills, how can I believe so fast?
在缆车上每过一个桩,速度很快,一会儿,到了山脚,我怎么能相信这么快呢?
CFG pile is short for the cement fly-ash gravel pile, which is mixed to a high bond strength pile with sand and water. CFG pile composite is formed by CFG pile, the soil between piles and cushion.
CFG桩是水泥粉煤灰碎石桩的简称,它是由水泥、粉煤灰、碎石、石屑和砂加水拌合形成的高粘结强度桩,和桩间土、褥垫层一起形成复合地基。
In order to reduce the time limit for a project and decreasing the expenses, short lime-soil compaction pile composite foundation were re-commended in this paper.
该方法可以在保证处理效果的基础上,达到缩短加固工期减少处理费用的目的。
Short-pile axial force increased, pile-soil stress ratio and the pile load distribution ratio did not change significantly.
柔性桩轴力有所增加,桩土应力比与桩的荷载分担比变化不明显。
Short-pile axial force increased, pile-soil stress ratio and the pile load distribution ratio did not change significantly.
柔性桩轴力有所增加,桩土应力比与桩的荷载分担比变化不明显。
应用推荐