A general model based on linear programming for short-term generation scheduling of cascade hydroelectric systems is proposed.
建立了基于线性规划的梯级水电系统短期发电计划通用模型。
Because of super short-term load forecast error, ATC is changing with the adjustment of the generation scheduling by the object function that purchasing charge is least.
考虑到超短期负荷预测偏差的情况下,以购电费用变化量最小为目标函数重新调整发电计划,从而导致电网可用输电能力(atc)发生变化。
The quadratic programming method is used to solve the short-term power generation scheduling problem under the condition of electricity market and considering the ramp constraints of generating sets.
文中以二次规划算法解决了电力市场环境下考虑爬坡约束的短期发电计划的制定问题。
With the in depth going of the electricity market the short term generation scheduling has become more and more important.
随着电力市场的不断深入,系统的有功优化调度在电力系统运行中占有越来越重要的地位。
The goal of this research is to overcome the limitations of the existing method of solving the short-term generation optimal scheduling in hydrothermal power systems.
为克服现有方法求解复杂水火电力系统短期发电优化计划的缺陷,提出一种新型优化算法对此类动态非线性约束优化问题进行求解。
The goal of this research is to overcome the limitations of the existing method of solving the short-term generation optimal scheduling in hydrothermal power systems.
为克服现有方法求解复杂水火电力系统短期发电优化计划的缺陷,提出一种新型优化算法对此类动态非线性约束优化问题进行求解。
应用推荐