Finally the paper presented the thought that setting up super-execution organization to prevent and control the black hole of management.
最后提出了建立超执行力组织来防治管理黑洞的思想。
In view of the problems encountered in the construction of pile setting by grouting man dug hole, such as flowing sand, silty soil, underground water and rock, some solutions are summed up.
针对人工挖孔灌注桩在施工时遇到的问题,如流沙、淤泥质土、地下水、岩石等,总结出一些解决办法。
In view of the problems encountered in the construction of pile setting by grouting man dug hole, such as flowing sand, silty soil, underground water and rock, some solutions are summed up.
针对人工挖孔灌注桩在施工时遇到的问题,如流沙、淤泥质土、地下水、岩石等,总结出一些解决办法。
应用推荐