Traditional method of serial testing and serial scheduling method increasingly reflect its limitations.
传统的串行测试方法和串行任务调度方法日益体现出了它的局限性。
According to critical path method and serial scheduling, a schema was discussed for computing time parameters of transitive predecessors and transitive successors.
根据关键路径法和串行调度原理,论述了先序活动和后序活动时间参数计算的方法,并以实例阐述了计算原理。
This paper proposes a Hybrid Genetic Algorithm(HGA) based on a serial scheduling heuristic method to solve the Resource-Constrained Transport Task Scheduling Problem(RCTTSP).
在利用串行调度启发式方法解决资源受限的运输任务调度问题(RCTTSP)的基础之上,提出了一种混合遗传算法(HGA)。
Combined with method based on order and serial schedule generation scheme and multi-project task list, the gotten scheduling scheme can meet the project schedule constraints of precedence relations.
采用基于排列的方法和串行项目进度生成机制,结合多项目的任务列表,可以保证所得调度方案满足项目优先关系约束。
Combined with method based on order and serial schedule generation scheme and multi-project task list, the gotten scheduling scheme can meet the project schedule constraints of precedence relations.
采用基于排列的方法和串行项目进度生成机制,结合多项目的任务列表,可以保证所得调度方案满足项目优先关系约束。
应用推荐