If we replace the inclusive decision and fork with two exclusive decisions, the process would only have one sequential execution path.
如果我们将包含性decision和fork替换为两个独占性decision,该流程将只有一条后续执行路径。
Selecting main operating parameters as decision variables and desired WMD as control goal, polycondensation production process is controlled by sequential quadratic programming (SQP) algorithm.
选择影响指标的主要工艺参数作为决策变量,以产品理想分子量分布为目标,采用序贯二次规划(SQP)算法对缩聚生产过程进行优化控制。
Selecting main operating parameters as decision variables and desired WMD as control goal, polycondensation production process is controlled by sequential quadratic programming (SQP) algorithm.
选择影响指标的主要工艺参数作为决策变量,以产品理想分子量分布为目标,采用序贯二次规划(SQP)算法对缩聚生产过程进行优化控制。
应用推荐