• Figure 3 shows the cross-ppc64-gcc package selected for installation in the yast2 tool.

    图3展示的是在yast2工具中选择安装的cross -ppc64 - gcc程序包。

    youdao

  • When the installation is completed, we see a friendly green checkmark, letting us know that everything selected for installation was successful (Figure 4).

    当安装完成后,我们会发现一个很友好的绿色标记,它告诉我们所选择安装的所有内容都是成功的(图4)。

    youdao

  • The next screen describes the set of media required for the installation, depending upon the packages selected, as shown in Figure 25.

    下一个屏幕说明了安装需要的介质集,这取决于所选择的包,如图25所示。

    youdao

  • Next screen is the installation summary screen for review and once next is selected, Lifecycle Manager will be installed in the request location and the installation is complete.

    下一个屏幕是安装摘要屏幕,用于检查已选择的设置。选择Next后,会将LifecycleManager安装在请求的位置,然后安装完成。

    youdao

  • In all situations, the action you need to take is well-thought out, and results in a final installation that offers the most functionality for a given combination of selected products.

    为了帮助你在安装特定组合的产品时获得最多的功能,我们考虑了所有的情况,分析了不同情况下你需要采取的行动,为你提供了一个最终的安装方案。

    youdao

  • We also selected a typical installation, and entered localhost for the Hostname, as shown in Figure 2.

    我们同样选择了典型安装,并且输入了localhost作为主机名,如图2所示。

    youdao

  • On the next screen, ensure that Check a new package group is selected, and either enter a new location for the installation or accept the default location to install Rational Performance Tester.

    在下一幅屏幕上,请确保Checkanewpackagegroup处于被选中状态,或者为安装输入一个新的位置,或者接受默认的安装位置。

    youdao

  • Installation scheme in air was selected for lifting and installing of steel gallery after comparing it with whole lifting method.

    比较空中散装方案和整体提升方案后,选择空中散装方案进行连廊钢结构的提升及安装。

    youdao

  • We have carefully selected the masterpieces of some world-class installation artists for this exhibition.

    我们选择了当今国际知名的装置艺术家,精选他们的代表作来筹备这次展览。

    youdao

  • Each component is selected for overall system compatibility, durability and cost effectiveness. Each Kerr packaged system is skid mounted, pre-wired and pre-piped to simplify installation.

    每个组件的选择都是为了整个系统的相容性,耐用性和成本效益。

    youdao

  • Each component is selected for overall system compatibility, durability and cost effectiveness. Each Kerr packaged system is skid mounted, pre-wired and pre-piped to simplify installation.

    每个组件的选择都是为了整个系统的相容性,耐用性和成本效益。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定