Sedimentation cycle study method and technology using wavelet time frequency analysis theory is mostly studied and exploited.
重点研究和开发了利用时频分析研究沉积旋回的方法和技术。
The cycle of sludge discharged out of horizontal sedimentation tank is 1 hour. The cycle of the filter tank is 24 hours.
平流沉淀池的最佳排泥周期为1小时,滤池过滤周期为24小时。
We quantified the sedimentation by determination of sludge sedimentation curve and found out a simplified and perceived method to control the sludge discharge cycle.
通过对杭州制水二公司平流式沉淀池污泥沉降曲线的测定、沉泥的量化,找到了一种较为直观、简单的以周期控制量为参照的排泥控制法。
A typical, complete cycle of SBR operation consists of five stages: water inlet period, reaction period, sedimentation period, water outlet period, and idle period.
典型SBR工艺的一个完整运行周期由五个阶段组成,即进水期、反应期、沉淀期、排水期和闲置期。
The sedimentary facies and the sedimentary cycle control low resistivity oil & gas zone on sedimentation .
在沉积上受沉积相、沉积旋回的控制;
N_1 reservoir is fine divided into four sand sets, 14 mbr through the application of theogram, ES curves characteristic, and the cycle of sedimentation delineated.
论文应用合成地震记录、电测曲线特征、沉积旋回相互结合的原则对南一段油层进行了精细划分,划分了4个砂层组,14个小层。
N_1 reservoir is fine divided into four sand sets, 14 mbr through the application of theogram, ES curves characteristic, and the cycle of sedimentation delineated.
论文应用合成地震记录、电测曲线特征、沉积旋回相互结合的原则对南一段油层进行了精细划分,划分了4个砂层组,14个小层。
应用推荐