• The technology can be used to keep cross-section excavation in control and improve explosion level.

    技术控制断面超欠提高光面爆破水平效果明显。

    youdao

  • On the puzzle of dynamic simulation of tunnel excavation with centrifuge model, this thesis makes a trial research on the section of SK3 + 395 of Shenzhen Metro and has made some progress.

    针对动态模拟隧道开挖难题利用离心模型深圳地铁sk3 + 395断面进行了尝试性研究取得一定进展

    youdao

  • The tunnel section is advised to adopt curved shape and full-face excavation by controlled blasting to reduce disturbance on surrounding rock and maintain its self-supporting capability.

    隧洞断面采用曲线形状; 宜采用控制爆破断面开挖减少围岩扰动以保持岩体承能力;

    youdao

  • This paper introduces excavation of the unfavorable geological section of tunnel project of Wanjiazhai YRDP, temporary brace and construction of concrete lining.

    文中介绍了万家寨引黄隧洞工程不良地质施工中的开挖,临时支护混凝土衬砌等

    youdao

  • Cutting excavation blasting in expressway construction is characterized by a wide range of excavation height, small excavation section and high quality requirements.

    高速公路路堑爆破开挖工程具有开挖高度变化、开挖断面、开挖轮廓要求严、特别是边坡质量要求高等特点。

    youdao

  • Prior to foundation pit excavation, the culvert section shall be prefabricated and carried to position.

    基坑开挖预制序运至工点摆放。

    youdao

  • According to the actual condition of high-cutting slope of Wushan-Wuxi Road K95 section, general-purpose finite element program ANSYS is used to simulate excavation process.

    根据两巫公路K 95高切实际情况运用ANSYS软件开挖过程进行了模拟

    youdao

  • This article introduces component of section measuring system and its application in excavation capacity measurement.

    介绍断面测量系统组成及其洞库容量测量中的应用

    youdao

  • The total construction plan of F3 weathered deep trough section and related technology methods of grouting, excavation and supporting were also mentioned and analysed in the paper.

    介绍F3风化深槽地段施工总体方案,重点阐述风化槽的注浆工艺开挖支护方法

    youdao

  • Methods of tunnel excavation in unconsolidated formations and the collapse zone treatment are intro-duced according to the formation properties fo exit section of Yangzong No.

    针对阳宗海一隧道出口地层特点,介绍松散土体地层中遂施工方法的选择及施工中出现坍塌处理方法

    youdao

  • In order to ensure the excavation of sediment discharge bottom outlet at right side and foundation of the power house dam section, the blasting method was used in Jinghong power station.

    景洪水电站主厂房右侧紧邻右冲底孔,右冲沙底孔作为二期纵向围堰组成部分,在主厂房开挖前已经形成。

    youdao

  • Said invention is specially suitable for laying underground pipeline to pass through the section of an area unable for open-excavation.

    发明特别适合于铺设地下管线穿越不可开挖地段工程使用。

    youdao

  • By analysis of difficult points in underdrainage design at excavation section, the paper briefly introduces thinkings and methods for underdrainage design at excavation section.

    通过挖方段暗排设计难点分析简要介绍挖方段暗排设计的思路方法

    youdao

  • The calculation about the area of filling-in and excavation of canal cross section is the basic work in earth volume of the canal designing.

    渠道断面面积计算渠道设计中的填挖土方量计算基础工作

    youdao

  • Methods of tunnel excavation in unconsolidated formations and the collapse zone treatment are intro-duced according to the formation properties fo exit section of Yangzong No. 1 Tunnel.

    针对阳宗海一隧道出口地层特点,介绍松散土体地层中遂道施工方法选择及在施工中出现坍塌处理方法

    youdao

  • Meanwhile hand excavation and weak explosion have been taken according to different ground condition . So it has finally passed this section smoothly .

    同时针对不同部位地层采取人工开挖爆破施工,顺利地通过了该地段

    youdao

  • The spoiling is a key factor influencing the advance speed for the shaft excavation, especially for the excavation of large cross section and deep shaft.

    对于竖井开挖尤其是断面竖井开挖 ,出环节 ,往往决定掘进速度快慢关键因素

    youdao

  • Many highway distresses often appear in the loess excavation section because the collapsible property of loess.

    由于黄土具有特殊湿性,黄土挖方地区时常发生公路病害

    youdao

  • The hydraulic calculation for cleaning of alluvial plain in the tailrace outlet section of Jintang Hydropower Project was made to reduce excavation quantity of the alluvium plain o…

    上游蓄水高程一定情况,尽量保持水出流平顺降低尾水高程增加电站机组出力、提高经济效益重要手段。

    youdao

  • The hydraulic calculation for cleaning of alluvial plain in the tailrace outlet section of Jintang Hydropower Project was made to reduce excavation quantity of the alluvium plain o…

    上游蓄水高程一定情况,尽量保持水出流平顺降低尾水高程增加电站机组出力、提高经济效益重要手段。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定