• The secondary support structure and the enclosing of the lining must be established in time to improve the performance of the lining.

    ④对于浅埋大断面大跨度连拱隧道,应及早施作二衬,封闭成环,以改善结构受力。

    youdao

  • Then, theoretical study was carried out on the rheology of Jinchuan rock mass and a nonlinear rheological model was established. The best secondary support time was found by fitting.

    然后,针对金川岩体的流变特征进行了理论研究,建立了非线性流变模型,通过拟合得出了最佳二次支护时机;

    youdao

  • Then, theoretical study was carried out on the rheology of Jinchuan rock mass and a nonlinear rheological model was established. The best secondary support time was found by fitting.

    然后,针对金川岩体的流变特征进行了理论研究,建立了非线性流变模型,通过拟合得出了最佳二次支护时机;

    youdao

$firstVoiceSent
- 来自原声例句