• Therefore, it is of very importance to perform schedule risk analysis before the implementation of R&D project.

    因此,在研发项目实施之前开展进度风险分析十分必要

    youdao

  • Using Monte Carlo Simulation (MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.

    运用网络计划蒙特卡洛仿真(MCS),宏观项目微观的工序层分别进行进度风险分析

    youdao

  • In the control of construction schedule for hydropower projects, risk analysis of the schedule is a key.

    工程施工进度风险分析计算施工进度控制中的重要环节

    youdao

  • The probability distribution and risk curve of schedule and cost are obtained by statistic analysis, providing a basis for risk evaluation of engineering projects.

    通过统计分析得到进度费用模拟概率分布,进而得到进度和费用风险曲线评价工程项目的风险提供依据

    youdao

  • The probability distribution and risk curve of schedule and cost are obtained by statistic analysis, providing a basis for risk evaluation of engineering projects.

    通过统计分析得到进度费用模拟概率分布,进而得到进度和费用风险曲线评价工程项目的风险提供依据

    youdao