Prepare common tools on schedule according to list provided by NPD engineer.
按时根据新产品导入工程师提供的清单准备普通工具。
But Jeme showed that he is an able engineer. He completed the work two years ahead of schedule and under budget.
但是詹天佑证明了他作为工程师的能力,施工时间比原定缩短了两年,建造成本也比预算少。
The KMI mission is to engineer, design and build paint & porcelain enamel finishing systems at a reasonable cost and within the project schedule.
KMI公司策划、设计和生产喷漆和瓷釉表层瓷漆系统,价格合理,保证在项目计划时间内完成。
Eventually, Jeme got the assignment as the chief engineer of the 37km stub line. Jeme managed to construct the railroad within budget and a very tight schedule.
最终,詹天佑被任命为这条37公里铁路线的总工程师3他成功地在预算内以及在非常紧迫的时间里完成了任务。
Prepare common tools on schedule according to list provided by NPD engineer.
按时根据新产品导入工程师提供的清单准备一般工具。
Prepare common tools on schedule according to list provided by NPD engineer.
按时根据新产品导入工程师提供的清单准备一般工具。
应用推荐