• Engineering contractor to design 1/4 in. Schedule 40S 316 SS piping interface to 3/4 in. Schedule 40 1G4 pipe.

    由工程设计承包商设计3/4英寸、壁厚系列号为401G4管道的1/4 英寸、壁厚系列号为40S 的316SS接口

    youdao

  • For instance, at the start of a "next generation version 1 product" — your confidence on your original schedule and level of estimate might be only 40 percent.

    举例来说,当下一代版本1产品开始开发时——对你原先时间表预计水平可能只有40%的自信

    youdao

  • Since this was a recurring schedule of every 6 hours, the system automatically scheduled a new edition to run at 1:40.

    由于个间隔6小时重复调度,所以系统自动调度了一个在1:40运行版本

    youdao

  • His schedule includes 40 hours of studying per week, which is about right for his course load.

    时间表计算,每周他花在学习上时间大概40小时,对于他的课业负担来说正合适

    youdao

  • The Ministry of Education announced Sunday that 40 quake-stricken counties in Sichuan will postpone the College Entrance Examination with the new schedule dependant upon relief progress.

    教育部表示,四川40受震灾严重延期高考,具体考试时间救灾情况另行确定。

    youdao

  • One group of participants received two nutritional counseling sessions of 40-60 mins each, while another group received a more intensive schedule of seven sessions over six months.

    个月中参与者参加4060分钟营养咨询

    youdao

  • Since I live 40 miles from the nearest town large enough for yoga studios, when I decided to take a class, I was more interested in the schedule than I was the type of yoga.

    最近能开瑜珈馆的城市的地方也40英里,所以决定上瑜珈课时,我感兴趣的课程安排不是课程的类型

    youdao

  • To participate in either study, women must be under age 40 and able to visit the Stanford clinic on a regular schedule.

    不管参加项研究妇女年龄必须40岁以下并且能够规定的日程前往斯坦福大学门诊就诊

    youdao

  • My schedule adherence must stand at about 40 per cent, 30 per cent if you include toilet breaks.

    排班契合率必定只有40%左右,如果上厕所的时间算进去,那就只有30%了。

    youdao

  • A project has a schedule reserve of 28 days when the customer add scope not previously planned for. The change has a 40 percent chance of delaying the project by an additional 14 days.

    项目28时间储备,然后客户突然增加了计划外的范围将导致项目延期14天的几率40%。

    youdao

  • A project has a schedule reserve of 28 days when the customer add scope not previously planned for. The change has a 40 percent chance of delaying the project by an additional 14 days.

    项目28时间储备,然后客户突然增加了计划外的范围将导致项目延期14天的几率40%。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定