Engineering contractor to design 1/4 in. Schedule 40S 316 SS piping interface to 3/4 in. Schedule 40 1G4 pipe.
由工程设计承包商设计到3/4英寸、壁厚系列号为401G4管道的1/4 英寸、壁厚系列号为40S 的316SS配管接口?
For instance, at the start of a "next generation version 1 product" — your confidence on your original schedule and level of estimate might be only 40 percent.
举例来说,当下一代版本1产品开始开发时——你对你原先的时间表和预计水平可能只有40%的自信。
Since this was a recurring schedule of every 6 hours, the system automatically scheduled a new edition to run at 1:40.
由于这是一个间隔6小时的重复调度,所以系统自动调度了一个在1:40运行的新版本。
His schedule includes 40 hours of studying per week, which is about right for his course load.
按他的时间表计算,每周他花在学习上的时间大概是40个小时,对于他的课业负担来说正合适。
The Ministry of Education announced Sunday that 40 quake-stricken counties in Sichuan will postpone the College Entrance Examination with the new schedule dependant upon relief progress.
教育部表示,四川40个受震灾严重的县延期高考,具体考试时间视救灾情况另行确定。
One group of participants received two nutritional counseling sessions of 40-60 mins each, while another group received a more intensive schedule of seven sessions over six months.
六个月中,一组参与者参加了两场40—60分钟的营养咨询课;
Since I live 40 miles from the nearest town large enough for yoga studios, when I decided to take a class, I was more interested in the schedule than I was the type of yoga.
最近的能开瑜珈馆的城市离我住的地方也要40英里,所以当我决定上瑜珈课时,我最感兴趣的是课程安排,而不是课程的类型。
To participate in either study, women must be under age 40 and able to visit the Stanford clinic on a regular schedule.
不管参加哪项研究的妇女,年龄必须在40岁以下,并且能够按规定的日程前往斯坦福大学门诊就诊。
My schedule adherence must stand at about 40 per cent, 30 per cent if you include toilet breaks.
我的排班契合率必定只有40%左右,如果把上厕所的时间算进去,那就只有30%了。
A project has a schedule reserve of 28 days when the customer add scope not previously planned for. The change has a 40 percent chance of delaying the project by an additional 14 days.
项目有28天的时间储备,然后客户突然增加了计划外的范围,这将导致项目延期14天的几率是40%。
A project has a schedule reserve of 28 days when the customer add scope not previously planned for. The change has a 40 percent chance of delaying the project by an additional 14 days.
项目有28天的时间储备,然后客户突然增加了计划外的范围,这将导致项目延期14天的几率是40%。
应用推荐