The various aspect problems in city construction are more and more complex with cities' scale and up-to-dateness continuously growing.
随着城市规模的不断扩大和城市更新水平的不断提高,城市建设中的各个方面问题越来越复杂。
Dynamic approaches have lots of advantages: they can scale up to larger problems (instead of creating arbitrary limits), and they don't have the problem of truncations causing security problems.
动态方法具有许多优点:它们能够向上适用于更大的问题(而不是带来任意的限制),而且它们没有导致安全问题的字符数组截断问题。
Problems creep in, however, when we try to scale this up — that is, when we try to gather all requirements, then do all design, then all development, then all testing in a strictly linear fashion.
然而,当我们试图将规模扩大时-也就是说,当我们按照一个严格的线性流程试图搜集所有的需求,并完成所有的设计,所有的开发,进行所有的测试时,一些问题就悄悄地出现了。
Seeing from the causes of scale economics, there exist some problems in commercial banks in China, thus a mathematical model of moderate scale in commercial banks is set up.
从银行规模经济形成的原因及其影响因素看,我国商业银行目前存在一些问题。为此,建立了银行适度规模的数理模型。
Therefore, these problems are worth following up from theory to practice:the special scale, the main management body, the management methods, special access to operation of the small town.
为此,从理论到实践有必要对经营小城镇的具体范畴、经营主体、经营手段和方式、具体运作途径等问题作深入探讨。
This dissertation studied the problems in dynamics and experimental simulation in the scale-up of leaching and desolventizing of toxic oil seeds (rapeseed and cottonseed) with TPS.
本文对TPS浸取含毒油籽(菜籽和棉仁)工艺放大过程中的若干问题进行了研究。
Process Engineers, especially at middle or small scale companies, are often faced with the problems of mixing equipment selection, design, scale-up and optimisation.
过程工程师特别是中小型化工企业的工程师,经常要面对关于混合设备的选择、设计、放大和优化的问题。
The scale-up and change of lyophilization cycles, including the freezing procedures, have presented some problems.
放大的和变更的冻干循环,包括冷冻程序,表现出一些问题。
Problems existed in simulation scale-up, engineering design, equipment manufacture and materials properties are main causes for the slow technical progress of the ammonia industry in China.
模拟放大、工程设计、设备制造和材料性能的问题,是我国合成氨工业技术进步缓慢的主要原因。
Just because there will be problems anyway does not mean you should launch prematurely; doing so will only scale up your difficulties to unmanageable levels.
仅仅因为总会遇到困难不意味着你可以提早发行,这么多只会让你将要遇到的问题成倍的增加到无法处理的地步。
There are some plan of management problems in the course of design for medium scale industrial construction projects, the article puts up some discussion and study in allusion to these being problem.
目前,对大中型工业项目设计策划还没有形成统一的管理模式,许多大中型工业设计项目在设计工作中存在着一些策划管理问题。
There are some plan of management problems in the course of design for medium scale industrial construction projects, the article puts up some discussion and study in allusion to these being problem.
目前,对大中型工业项目设计策划还没有形成统一的管理模式,许多大中型工业设计项目在设计工作中存在着一些策划管理问题。
应用推荐