• It provides approaches to make full use of available spatial technologies and data for rainfall-runoff modeling and technical improvement of hydrological forecast.

    这对充分利用现有空间技术和空间数据进行降雨-径流模拟并改进水文预报方法提供了研究途径。

    youdao

  • Through analysis of the sensitive parameter CN of the SCS model, the sensitivity of runoff modeling to DEM resolution is described from the perspective of slope change.

    根据SCS模型敏感参数cn,从坡度参数变化角度分析了不同分辨率的DEM对流域径流量影响。

    youdao

  • Method combining DEM with stream network leads to a more accurate drainage network from surface runoff modeling, especially for flat area. Method of modifying existing DEM by add…

    水系图与DEM结合的方法可以消除径流模拟结果与现有水系不吻合的现象,有效提高径流模拟精度。

    youdao

  • From 1999 to 2000, we had made modeling experiments for a year to Xianghuaqiao runoff experiment station.

    从1999到2000年,我们在香花桥径流试验站进行了一年多的模拟试验。

    youdao

  • The total efficiency of the runoff model from 1981 to 1990 is 61.3%, and the main reasons of the low modeling precision were analyzed also.

    1990年产汇流模拟总体效率为61。 3%,本文同时也分析了模型精度偏低的原因。

    youdao

  • The modeling result shows that land use structure and pattern change results in the increase of maxi- mum flood peak and flood discharge and the decreases of runoff concentration time.

    模拟结果表明,土地利用结构与格局的变化,使得暴雨洪水的最大洪峰流量和洪量加大,汇流时间变短。

    youdao

  • The modeling result shows that land use structure and pattern change results in the increase of maxi- mum flood peak and flood discharge and the decreases of runoff concentration time.

    模拟结果表明,土地利用结构与格局的变化,使得暴雨洪水的最大洪峰流量和洪量加大,汇流时间变短。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定