Before running casing string, we must calculate drag in wellbore and make the feasibility analysis of running casing string.
在套管下入之前,必须计算套管在实钻井眼中的受力大小,预测套管柱下入的可行性。
Hole enlargement through the Tertiary system and the Carboniferous system in test Wells are less than 6%, therefore, got a successful completion logging and running casing strings.
试验井三叠系、石炭系平均井径扩大率小于6%,完井电测及下套管固井等作业顺利。
Hole enlargement through the Tertiary system and the Carboniferous system in test Wells are less than 6%, therefore, got a successful completion logging and running casing strings.
试验井三叠系、石炭系平均井径扩大率小于6%,完井电测及下套管固井等作业顺利。
应用推荐