There were two unique phases in the baseline run: a 24-hour "initial test," followed by the stress reliability run phase, or "stress test."
在基线运转中有两个特别的阶段:一个24 小时的“初始测试”,接下来是压力可靠性运转阶段,或者说是“压力测试”。
There were two unique phases in the baseline run: a 24-hour "initial test," followed by the stress reliability run phase, or "stress test."
在基线运转中有两个特别的阶段:一个24 小时的“初始测试”,接下来是压力可靠性运转阶段,或者说是“压力测试”。