• Civil engineering and construction corporations' characters make project contractor full of risk.

    建筑工程施工企业特点决定工程项目建设中风险重重

    youdao

  • So it is very important to control risk of transportation project effectively with modern management technique, especially with systems engineering techniques.

    充分运用现代项目管理技术特别是系统工程技术,进行有效风险管理具有重要意义。

    youdao

  • The risk management of engineering projects is the whole process project control and management by stages.

    工程项目风险管理阶段全过程项目控制管理。

    youdao

  • Risk probability and loss can be reduced in project contracting of ocean engineering by the results and advices of assessment.

    通过评估结果建议,以降低海洋工程项目承包风险发生可能性,减少事故损失

    youdao

  • Finally, canonical method that can identify and solve risks will be formed and will be guidance for the practical risk management of construction engineering project.

    最后形成一种全面认识解决项目所面临风险规范方法实际建筑工程项目风险管理指导作用

    youdao

  • A certain risk would be in the charge-contract of engineering project, and would be incarnated centrally in the stages, such as engineering bid, engineering contracting, and constructing etc.

    工程项目费用承包存在着一定风险这些风险集中体现工程投标阶段、工程合同签订阶段工程施工阶段

    youdao

  • Lead the best control of the plant - gene engineering project risk management and the whole risk control mechanism.

    引入植物基因工程项目风险管理最优化控制总体风险控制机制

    youdao

  • Fuzzy math and the theory of AHP are combined to set a fuzzy overall analysis model, which is used in the engineering project quality risk analyses.

    模糊数学层次分析方法相结合建立模糊层次分析模型应用工程项目质量风险分析

    youdao

  • Through the contrast of the plan and the analysis of the key aspects, we can find the latent risk in the engineering project, and the direction for the next step of project implementation.

    通过工程项目进行方案对比关键因素分析找出工程项目潜在风险项目实施指明方向。

    youdao

  • From the views of contractors, the dissertation is focused on the quantitative risk evaluation methods in the bidding process of international lager civil engineering project.

    本文承包商角度对国际大型土木承包工程项目投标过程中的风险评估方法进行深入系统地研究。

    youdao

  • Aiming at the multi-risk factors and complexity of decision in project bidding, established the evaluation index system of risks in tender for domestic architectural engineering.

    针对工程投标风险因素决策复杂性建立国内一般建筑工程投标的风险指标评价体系

    youdao

  • The theory and management process of overall engineering project risk management have been studied in this article, and there are also introduction of the tools and methods of risk management.

    本文工程项目全面风险管理理论及其管理过程进行了研究探讨,详细介绍了各种管理工具方法

    youdao

  • Risk control of engineering project is an important research issue in the study of engineering project management, also in constructing risk precaution system.

    工程项目风险防范和控制工程项目管理重要研究课题构建工程项目风险预警系统具有重要意义。

    youdao

  • During the engineering feasibility study period, risk assessment is an important approach to the scientific decision-making of the project.

    在前期论证阶段工程实施过程中可能遇到各类风险进行定量化评估项目科学决策一条重要途径

    youdao

  • Secondly, it is discussed respectively the main process of structural engineering project risk management-risk identification, risk analysis and assessment, risk control and decision.

    其次,对建筑工程项目风险管理主要过程:风险识别、风险分析评估、风险控制与决策分别进行了阐述。

    youdao

  • Abstract: Based on the engineering contract risk analysis, elaborates the three principles of project contract risk allocation.

    [摘要]工程合同风险进行分析基础上,阐释工程合同风险分配的三大原则

    youdao

  • On the basis of analyzing the different risks that related to the engineering project, this paper has put forward the general methods of risk distinguishing to the engineering project.

    文章分析项目工程风险基础上提出了工程项目风险辨识一般方法

    youdao

  • Risk analysis is made for project contracting by the method of process analysis and the technique of risk assessment, considering the present status of ocean engineering.

    运用过程分析方法风险评估技术结合海洋工程项目现状,对项目承包进行风险分析。

    youdao

  • In the part of road engineering project risk evaluation, this paper puts forward the method of fuzzy and utility risk evaluation based on the method of fuzzy and utility risk measurement.

    公路工程项目风险评价中,本文基于模糊效用风险度量提出了模糊效用风险评价法。

    youdao

  • With a specific case, this paper discusses the characteristics of risks in overseas engineering projects and analyzes the method of formulating project risk management plan.

    本文结合具体案例,对海外工程项目风险管理性质特殊性做了分析,并提出了风险防范的措施

    youdao

  • Reverse engineering is the root of the hell project, and it is also the root of the risk cost of the reengineering.

    逆向工程维护“地狱根源,即再工程风险成本来源

    youdao

  • Project management Consulting: Consulting of engineering project management, project risk management, project procurement management, project cost management, project integration management and so on.

    项目管理咨询工程项目管理、项目风险管理、项目采购管理、项目成本管理、项目集成管理方面咨询。

    youdao

  • The paper is an effective exploration for the owner's risk management of large mechanical and electrical engineering project.

    本文就是机电工程项目的业主风险管理模式进行有效探索

    youdao

  • This article is based on the engineering practice summarizes the owner of the project design stage risk management work should focus on issues, and to propose practical coping strategies.

    本文工程实践基础总结了业主方工程项目设计阶段风险管理工作中着重注意的问题提出了切实可行应对策略

    youdao

  • Finally, this thesis puts forward the countermeasures of engineering project risk.

    最后提出工程项目风险管理对策。

    youdao

  • Through these analyses, we can get the integrated system of owner's risk management of large mechanical and electrical engineering project.

    这样建立起了大型机电工程项目个完整业主风险管理体系

    youdao

  • Risk control of engineering project is an important research issue in the study of engineering project management, also in constructing risk assessing system.

    工程项目风险防范和控制工程项目管理重要研究课题构建工程项目风险评价体系具有重要意义。

    youdao

  • The index of environment risk assessment system was established based on the properties of chemical engineering project. Fuzzy identification method as well as the case study was studied.

    根据化工建设项目特点建立环境风险评价系统指标体系,研究模糊评判方法应用实例进行分析计算。

    youdao

  • The index of environment risk assessment system was established based on the properties of chemical engineering project. Fuzzy identification method as well as the case study was studied.

    根据化工建设项目特点建立环境风险评价系统指标体系,研究模糊评判方法应用实例进行分析计算。