• The purpose of risk evaluation is to assist in making decisions, based on the outcomes of risk analysis, about which risks need treatment and the priority for treatment implementation.

    风险评价目的风险分析输出基础支持哪些风险需要处理处理实施优先权决策的制定。

    youdao

  • By contract risk evaluation, risk disposal ability evaluation and risk strategy cost calculation, proposes the contract risk allocation model based on engineering dynastic operation.

    并以合同风险评价、风险处置能力评估、风险策略成本测算为依托,提出基于工程动态运行的合同风险分配模型

    youdao

  • This paper is aimed at presenting a suit of effective evaluation methods of earthquake loss risk of single structure based on the sufficient analysis of earthquake hazards.

    本文目标就是充分分析地震灾害基础给出切实可行单体建筑物地震损失风险评估方法

    youdao

  • Based on SSE-CMM, by using layer analysis, we give the evaluation method of the information systems, the risk factor and the estimation method of disaster loss.

    sse - CMM为基础,应用层次分析方法,讨论信息系统风险评判算法给出灾难损失估计方法。

    youdao

  • Based on the public health risk evaluation method , the health risks due to thegaseous effluents of chemicals and radionuclides from a typical coal-fired power plant are evaluated.

    利用公众健康危害评价方法,计算了一个较典型燃煤电厂气载释放的化学污染物质放射性物质对人体产生的健康危害。

    youdao

  • In the part of road engineering project risk evaluation, this paper puts forward the method of fuzzy and utility risk evaluation based on the method of fuzzy and utility risk measurement.

    公路工程项目风险评价中,本文基于模糊效用风险度量提出了模糊效用风险评价法。

    youdao

  • The paper designs an expert inquiry similar to Delphi method, and identifies and classifies the indexes in tender evaluation based on the ability of tender to control engineering risk.

    本文设计了类似于德尔菲法的专家调查识别投标商风险控制能力评价指标,构造了指标结构系统。

    youdao

  • The paper discusses the Evaluation of City Regional Fire Risk, and puts forward a qualitative and quantitative evaluation method based on extension theory and AHP.

    本文利用可拓层次分析法基本原理提出一种定量定性相结合的城市区域火灾综合风险评价方法

    youdao

  • Based on the research of HR risk evaluation system under fuzzy neural network, this thesis tries to bring forward a solution to evaluate HR risks.

    本文为基于模糊神经网络人力资源风险评估系统研究提出一种思路和方案

    youdao

  • Risk analysis and risk evaluation are mainly based on the nature of risk identification, to perform a thorough analysis and evaluation to every identified risk.

    风险分析风险评价主要是在风险辨识基础一项风险性质进行分析做出评价。

    youdao

  • The paper expounds the design and development of the software for city regional fire risk evaluation based on index system.

    本文阐述基于指标体系城市区域火灾风险评价软件设计思想开发

    youdao

  • Considered the relationship among failure modes, a failure risk evaluation and optimization method for mechanical product design scheme based on knowledge model was proposed.

    考虑失效模式关联性,提出一种基于知识模型机械产品设计方案失效风险评估优选方法

    youdao

  • Based on the method of risk evaluation, the risk assessment approach is improved due to the method of disadvantage and trait of oil pipeline in our country.

    针对管道风险综合评价专家评分不足,结合我国输油管道特点改进输油管道风险评价方法

    youdao

  • Based on risk identification, risk analysis and evaluation, risk control develops some measures to reduce risk.

    风险控制是在风险识别、风险分析评价基础,采取相应措施降低风险。

    youdao

  • A risk evaluation system should be set up based on their failure probability analysis and the economic and life loss of tailings reservoir failures.

    应该着手建立尾矿库失事概率分析失事所造成的经济损失生命损失估算基础风险评价体系

    youdao

  • Grounded on the integration of the traditional pricing model, it put forward the mortgage loan pricing system based on risk evaluation which circles around the central effect factors.

    在分析研究基础上,针对主要影响因素,结合现有定价模型提出基于风险评价住房贷款定价体系

    youdao

  • Based on the characteristics of aviation projects, this dissertation mainly focuses on the research of risk evaluation methods of aviation projects.

    本文针对航空项目特点和管理现状,航空项目风险评价技术进行研究

    youdao

  • The DNR project manager will assign a risk evaluation to each project based on the amount of material spilled and the level of threat.

    红霉素项目经理指派一个风险评估每个项目基础材料数量油的威胁程度

    youdao

  • Secondly, after comparatively analyzing various risk evaluation methods, a risk decision-making model of project development based on Fuzzy Assessment was built.

    接着对比分析各类风险评价方法基础上,构建了基于模糊综合评价的风险决策模型

    youdao

  • On the study on traditional financial risk assessment method, the text introduces the method of extension evaluation which is based on the theory of matter-element.

    本文传统财务风险评价方法研究基础引入基于理论评价方法。

    youdao

  • Taking Shandong Province as an example, a risk evaluation system for the sea water invasion is established based on GIS technology.

    山东省,利用GIS技术建立一套海水入侵灾害危险性评价信息系统

    youdao

  • Based on the risk analysis of seller under the circumstances of SC, this paper USES risk factor analysis and multiple fuzzy comprehensive evaluation to evaluate risk and build a relevant model.

    供应链环境下销售商风险进行分析基础上,利用风险因素分析多级模糊综合评估相结合的方法进行风险评估,建立相应模型,进一步用风险系数量化销售商风险的大小。

    youdao

  • A risk evaluation method based on Bayesian network is proposed to quantitatively evaluate ERP consultation project risk of consulting firm.

    针对咨询公司ERP咨询项目风险特点和风险定量评估要求,提出基于贝叶斯网络的ERP咨询项目风险评估方法

    youdao

  • Finally, based on results of the evaluation to determine the risk of the distribution of project risks, and emerging from the study made by the corresponding preventive measures.

    最后根据评价结果判断项目风险风险分布状况通过研究得出提出了相应防范对策

    youdao

  • Risk management is based on risk identification and evaluation. This paper makes a study on risk assessment on EPC project.

    风险管理基础风险识别评价本文就EPC总承包的风险评价进行研究

    youdao

  • Now there are two methods for evaluation of internal control-risk-based method and detail method, and the former has higher effectiveness and efficiency.

    目前情况来看,评价企业内部控制的方法总体上可以分为详细评价风险基础法两种,风险基础法相对来说具有更高成本效益效率

    youdao

  • Firstly, based on the preliminary evaluation for environment of dangerous source at the prospecting stage, the risk factors effect and construction of risk reduction can be determinated.

    首先据勘察资料对隧道突涌水环境进行初步评价,以确定隧道不同区段降低致险因子影响度施工对策

    youdao

  • Firstly, based on the preliminary evaluation for environment of dangerous source at the prospecting stage, the risk factors effect and construction of risk reduction can be determinated.

    首先据勘察资料对隧道突涌水环境进行初步评价,以确定隧道不同区段降低致险因子影响度施工对策

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定