This paper presents a simulation method of the defective lag damper fault on a helicopter rotor test rig.
提出了一种在模型直升机旋翼故障试验台上模拟减摆器失效故障方法。
To study the spacing effect on the cooling package performance, a rear mounted wheel loader's cooling package was tested on a wind tunnel test rig.
为了研究换热器间距对冷却组性能的影响,将某轮式装载机后置冷却组放在风洞试验台上进行测试。
Experimental study on heat transfer and flow resistance of louver fins with 8 different structural parameters were carried out on a wind tunnel test rig.
在风洞试验台上对8种不同结构参数的百叶窗翅片进行传热和流动阻力的性能试验。
Their separation efficiencies and flow resistances were all measured, under the same operating conditions, in a large scale cold state test rig.
在大型冷态试验台上相同的运行工况下,测试了它们的分离器效率及阻力。
Corrugation test was conducted on a rolling vibration test rig.
再现试验用机车轮对在滚动振动试验台上进行。
In order to validate auxiliary airstart performance of a gas turbine starter designed only for the ground engine, the test of auxiliary airstart was conducted on the flight test rig.
为验证原本只为在地面起动发动机而设计的某型燃气涡轮起动机的空中辅助起动性能,在飞行试验台上,对其进行了空中辅助起动试验。
Pressure valve test can be conducted in a dedicated test rig can also be carried out in an integrated test bed.
压力阀的测试可以在专用的试验台上进行,也可以在综合性试验台上进行。
The paper describes the test and application of jumbo rig in tunneling in Beiminghe Iron Mine.
叙述了北沼河铁矿凿岩台车掘进巷道的试验与应用情况。
This paper presents the composition of the test rig for a newly developed speed governor as well as the governor's work principle and performance matching specifications.
介绍对新研制的限速器进行试验的系统组成,限速器工作原理和工作过程,及其性能匹配技术要求等。
Metal oxide etch usually happens on the thermal hydrodynamic test rig when its equipment, pipelines and valves are made of carbon steel.
在由碳钢制造的设备、管道和阀门等部件所组成的热工水力试验台架中,金属的氧化腐蚀是一个普遍存在的问题。
A test rig for testing the flow characteristics of ball orifice is introduced. Experiments on the flow characteristics of ball orifices with different structure parameters are carried out.
介绍了球阀阀口流量特性试验装置,对水压球阀在不同结构参数下的流量特性进行了试验研究。
The properties of plain carbon fabric prepreg were researched using a picture frame shear rig which is (installed) on a mechanical test machine.
利用安装在拉伸试验机上的像框剪切装置,研究了平纹预浸碳纤维机织织物的剪切行为。
On a SCR denitration test rig, tested was the performance of the catalyst under various conditions and conducted was a comparison with commercial catalysts having a similar structure.
在SCR脱硝试验装置上测试各种条件下催化剂的性能,并与结构类似的商业催化剂进行对比。
The fuel pump rig test and troubleshooting system can achieve its purpose of test and troubleshooting by monitoring the working performance and parameter of the fuel Pump.
该试验台通过对高压柴油泵的工况性能及参数的测试,达到对高压柴油泵进行校正和故障诊断的目的。
Creating a simple animation for your rig or importing some animation data to act as a test for the skinning.
为你的骨骼创建一个简单的动画或者导入一些动画数据作为一个蒙皮结果的测试。
On a test rig of flue gas humidification and desulfurization an experimental study was conducted of the desulfurization performance of calcium oxide activated by steam humidification.
在烟气增湿脱硫实验台上,进行了蒸汽水合生石灰的脱硫实验研究。
It is very important for drilling parameters test to better drilling parameters, design drill rig, research on drilling technology.
钻进参数检测对钻进参数优化、钻机设计、钻进工艺研究具有重要作用。
This thesis introduces briefly the structures, test situations and main technical parameters of the drill rig.
本文着重介绍了钻机的结构特点、试验情况、主要技术参数等。
A test rig of PTR was built and consummated. Experimental study was conducted for the co-axial PTR, which is superior in miniaturing and practical application.
建立和完善了脉管制冷机性能测试试验台;对在微型化、实用化方面有优势的同轴脉管制冷机进行了实验研究。
On-site vibration test of the servicing rig substructure is made, and the frequency response function curve and preceding 10 modes frequency are obtained.
对现役钻机底座做了现场振动测试,得到频响函数曲线及前10阶模态频率。
Experiments of dense-phase pneumatic conveying for pulverized coal with different mean particle size were carried out on the test rig of high pressure dense-phase pneumatic conveying.
在高压密相气力输送试验台上,进行了不同平均粒径煤粉的密相输送试验。
This paper presents a new kind of bidirectional oil damper test rig.
介绍一种新型双向式油压减振器试验台。
In this paper, the principle of load simulation and the basic structure of the brake test rig are expounded.
本文阐述了该种制动器试验台的模拟载荷原理及其基本构造。
The article puts emphasis on the qualification test of the steam-water separating device at hot conditions in a high temperature and pressure water test rig.
着重介绍了在高温高压水试验台上进行的立式蒸汽发生器汽水分离装置的热态考核试验。
The paper presents the model experiments of one-pick and drum cutting systems on a hydraulic planner and a special cutting test rig with the artificial analogous cutting materials.
本文利用人造模拟截割材料,在液压刨床和专用截割实验台上完成了单齿和滚筒截割系统的模化实验。
Comparative experiments of spray and packed saturators were performed with a saturator test rig.
建立了饱和器实验台,对空心饱和器和加填料饱和器进行了对比性实验。
According to theoretical calculation and test results in 1: 1brake test rig, it proves that the brake shoes may meet the brake needs ofDF8B diesel locomotive.
通过理论计算和1:1制动试验台试验,证明该闸瓦完全能满足东风8B内燃机车的制动要求。
Test rig of sharp rub-impact rotor is designed and meticulous experiment has been accomplished. Characteristic rule of vibration response is obtained in various cases of rub-impact.
设计了尖锐碰摩转子试验台并开展了细致的实验研究,获得了不同碰摩情况下的振动响应特征规律。
Test rig of sharp rub-impact rotor is designed and meticulous experiment has been accomplished. Characteristic rule of vibration response is obtained in various cases of rub-impact.
设计了尖锐碰摩转子试验台并开展了细致的实验研究,获得了不同碰摩情况下的振动响应特征规律。
应用推荐