The resource table can have an entry for each resource partition. When a new program is to be started, an available partition is allocated to it.
若系统中同一资源类中存在许多资源单位,程序的资源请求只指明要求哪类资源而由操作系统检查该类中是否有可用的资源单位可以分配。
Table 6 gives some examples of resource requests, the handler information, and the event data passed in.
表6给出了资源请求的一些示例、处理程序信息,以及传入的事件数据。
In Table 1 you can see a breakdown of the differences between OLTP and OLAP databases, with particular regard to access patterns and resource usage for each type.
在表1中,您可以看到OLTP和OLAP数据库间差异的细目,这些差异主要与每种技术使用的访问模式和资源使用情况相关。
For example, I can define one resource reference to a data source with a specific isolation level for a table, while defining another reference to the same database with a different isolation level.
例如对表格来说,能够使用特定的分离级别在数据源中定义一个资源应用,同时使用不同的分离级别在相同数据库中定义另一个引用。
This essentially ties a resource to the table.
实质上就是把资源和表结合在一起。
This essentially ties a resource to each table.
实质上是把资源与表结合起来。
Table 1 describes the resource to get the content from the API.
表1列出了用来从API获取内容的资源。
The detailed information for each component of the resource group name is described in Table 4.
表4中描述了资源组名中每个成分的详细信息。
The second approach is to provide the MQ messaging provider resource with a uniform resource locator (URL) that points to a client channel definition table (CCDT).
第二种方法是向MQ消息传递提供程序资源提供指向客户端通道定义表(CCDT)的统一资源定位符(URL)。
Within the child thread, open a new connection to DB2 and fetch a row from the lock table for the requested resource ID.
在子线程中,打开新的DB 2连接,在锁表中获取具有所请求的资源ID的一行。
This database includes the Customer table, which is the table that the application will synchronize, and the event table that the JDBC resource adapter will poll to create inbound events.
此数据库包括应用程序将要同步的客户表和JDBC资源适配器将轮询以创建入站事件的事件表。
The maximum number of applications allowed to access a resource concurrently is defined by the number of rows for this resource in the lock table.
锁表中一个资源的行数决定了可以同时访问这个资源的最大应用程序数量。
When having duplicate rows in the lock table (see the Create a DB2 table for resource locking section), concurrent use of the resource is possible.
如果锁表中有重复的行(参见为资源锁定创建一个DB 2表一节),就可以对资源进行并发使用。
The Data Source table in the Resource Monitoring tab displays the configured data sources that are collected from when this schedule executes.
ResourceMonitoring选项卡中的DataSource表展示了,当执行该进度表时,收集的数据所来自的配置的数据源。
Create a new distribution queue resource (see Figure 13); click new and enter the information specified in Table 5.
创建一个新的分发队列资源(参阅图13);点击new并输入表5中指定的信息。
Table 6 shows the full comparison of all key resource metrics on a Lotus Domino 8.5 server with and without DAOS enabled.
表6展示了启用和未启用DAOS的LotusDomino 8.5服务器上的所有关键资源指标的完整对比。
Create a DB2 table for resource locking.
为资源锁定创建一个db2表。
Make sure that you select the Customernews table as your content resource (Figure 13).
确保您选择了Customernews表做为您的内容资源(图13)。
Table 5 shows that there was a significant reduction of resource usage by upgrading from Lotus Domino 8.0 to Lotus Domino 8.5 with the Mail85 template and ODS51. These reductions were seen.
表5展示了从LotusDomino 8.0升级到使用Mail85模板和ODS51数据库的Lotus Domino 8.5后资源占用大幅减少。
Table 5 shows the resource usage at steady state for 4,000 simulated users. The comparison is between Lotus Domino V7 using mail7.ntf.
表5显示对于4,000个模拟用户在稳定状态下的资源使用情况。
Table 3 shows an example of a RESTful mapping to the example resource.
表3给出了到示例资源的RESTful映射。
Create the database table for this resource by going to the Console TAB (circled in yellow in Figure 3) and typing the following command in the command prompt.
通过切换到Console选项卡(图3中的黄色圆圈位置)并在命令提示中输入以下命令为这个资源创建数据库表格。
The operating system cannot access this hypervisor resource directly, and USES hypervisor calls to read or write a new entry to the global page table.
操作系统不能直接地访问这个Hypervisor资源,可以使用Hypervisor调用读取全局页表、或者向全局页表写入一个新的条目。
As the first component, define a Zero Resource Model (ZRM) -which is equivalent to a relational database table, but provides numerous services on top of it.
作为第一个组件,定义一个ZeroResourceModel (ZRM)—这等同于一个关系数据库表,但在表上提供各种服务。
Historically, these were defined by macros which built a Program Control Table (PCT), but are nowadays defined in TRANSACTION definitions within the resource definition on-line (RDO) database.
从历史上看,通过宏命令来定义事务id,这些宏命令创建程序控制表(Program Control Table,PCT),但是目前是在在线资源定义数据库(resourcedefinition on - line,RDO)内部的TRANSACTION定义中定义事务id。
The next two tables display resource utilization numbers when testing 6000 users with both templates. The first table shows results obtained with mail6.ntf
接下来的两个表显示了在使用两个模板测试 6000 个用户时资源的使用情况。
The next two tables display resource utilization Numbers when testing 10,000 users with both the Mail6 and Mail7 templates. The first table shows results obtained with the Mail6 template.
下面两个表显示了在测试10,000个使用Mail6和Mail7模板的用户运行时对资源的占用情况。
After you publish, the resource is available as a table or as a stored procedure within a database under the Virtual View Manager data Services node, as shown in Figure 7.
发布之后,资源可以作为VirtualViewManagerDataServices节点的数据库中的表格或存储过程使用,如图7所示。
In the previous steps, a resource was associated with the table. Now, you will specify which attributes or columns of the resource will be used to populate the table.
在上面的步骤中,一个资源与该表关联在了一起。
In the previous steps, a resource was associated with the table. Now, you will specify which attributes or columns of the resource will be used to populate the table.
在上面的步骤中,一个资源与该表关联在了一起。
应用推荐