• I have experienced a case where the price for a shopping cart item was calculated in an Enterprise Resource Planning (erp) system, item by item.

    我曾经历过这样一个情况,在企业资源计划(ERP)系统中,购物车里条目的价钱逐个地计算。

    youdao

  • Choosing the device manager depends on the operating system where Resource manager sits or products that integrate with Resource manager.

    设备管理器的选择取决于资源管理器所在的操作系统或与资源管理器相集成的产品。

    youdao

  • Some of the boxes are updated automatically every 30 seconds, providing a manager with fresh information from the Enterprise Resource Planning (erp) system.

    部分对话框每隔30秒自动更新,为管理者提供来自EnterpriseResourcePlanning (erp)系统的新信息。

    youdao

  • Resource utilization refers to the use of system resources such as CPU, memory and disks in performing SQL queries.

    资源利用率指的是执行SQL查询时,CPU、内存和磁盘等系统资源的使用。

    youdao

  • LOTHAR (Land Optronic thermal Aiming Resource) is a multi sensor system specifically designed for Fire Control Systems equipped with the "Tilde" thermal camera (ir cooled).

    Lothar系统是一种多传感器系统,专为配备“蒂尔德”热成像仪(红外制冷)的火控系统设计。

    youdao

  • System administrators can create their own custom meters based upon existing resource metering data.

    系统管理员可以根据已有资源计量数据创建他们自己定制的计量表。

    youdao

  • Use command resource security to ensure that only the queue manager's administrators can modify SYSTEM resources of any kind, such as queues and channels.

    使用命令资源安全性确保只有队列管理器的管理员能够修改任何种类的SYSTEM资源,如队列和通道。

    youdao

  • You can do so by limiting access to the commands that can affect them, and also through command resource security. Here are some considerations for SYSTEM resources.

    为此,可以限制对可能会影响它们的命令的访问,或者,也可以通过命令资源安全性提供保护。

    youdao

  • Understand operating system resource considerations

    理解操作系统资源方面的考虑

    youdao

  • Making these changes remove some system resource consumption restraints for the user ID.

    做出这些更改将消除该用户ID 的某些系统资源消耗约束。

    youdao

  • This level of protection lets the application allow or restrict other applications to access the system resource.

    这种级别的保护让应用程序允许或限制其他应用程序访问系统资源。

    youdao

  • They could consist of warehouse management systems (WMS), Electronic Data Interchange (EDI), or an enterprise resource planning system.

    这些系统可能包含仓库管理系统(WMS)、ElectronicDataInterchange (EDI)或企业资源规划系统。

    youdao

  • You must acquire a resource adapter for the EIS system.

    您必须为EIS系统获取一个资源适配器。

    youdao

  • This produced a moderate load with no resource bottlenecks when the system was not overcommitted.

    这在系统未超量使用时可以产生没有资源瓶颈的中等负载。

    youdao

  • When using the REST API to deploy patterns into a private cloud, you will first create a virtual system resource.

    使用RESTAPI将模式部署到私用云时,您需要首先创建一个虚拟系统资源。

    youdao

  • DB2 provides features unique to Linux to make the best use of this system resource.

    DB 2提供了特定于Linux的一些特性,以便充分利用系统资源。

    youdao

  • These parameters are used to control resource consumption on the WFS system.

    这些参数可用于控制WFS系统上资源的消耗。

    youdao

  • Others are looking to reduce system resource requirements by using "mashup" applications or outsourced hosting.

    其他公司则试图通过使用“mashup”应用程序或外包托管来减少对系统资源的需求。

    youdao

  • They contain additional metadata as well as change summary and event summary information that is required by various enterprise information system resource adapters.

    它们包含附加的元数据,以及变更概要和事件概要信息,各种企业信息系统资源适配器中通常需要这些信息。

    youdao

  • When set to automatic, DB2 automatically adjusts these parameters to reflect the current resource requirements for the system.

    当设置为自动时,DB 2自动调整这些参数,以满足系统当前的资源需求。

    youdao

  • When it is returned to the browser it will specify the IMT that we defined when we added the resource to the system.

    当它被返回到浏览器时,它会指定我们把资源添加到系统时所定义的IMT。

    youdao

  • The four steps to this combination test method are: test selection, system resource utilization evaluation, kernel code coverage analysis, and final stress test evaluation.

    这一组合测试方法的四个步骤是:测试选择、系统资源利用率评价、内核代码覆盖分析以及最终的压力测试评价。

    youdao

  • On the VMware ESX server, the system resource monitoring is done by using the VMware Infrastructure Client performance tooling, as shown in Figure 4.

    在VMwareESX服务器上,系统资源监视是使用 VMware基础客户端性能工具来完成的,如图 4 所示。

    youdao

  • If the system fails to find a resource by its ID, it returns 404.

    如果系统无法根据资源的ID找到它,就会返回404。

    youdao

  • You need to repeat these steps until there are no more bottlenecks in the system, and each resource is fully utilized.

    需要重复这些步骤,直到系统中没有瓶颈,每种资源都充分使用为止。

    youdao

  • If you are new to Cell be technology, remember that the PPE is the resource manager for the system.

    如果您是新接触Cell BE技术,请记住PPE是系统的资源管理器。

    youdao

  • The two keys errors.header and errors.footer are required by the system in every resource properties file.

    在每个资源属性文件中系统都需要errors.header和 errors.footer这两个关键字。

    youdao

  • Not requiring a database server makes Pebble more lightweight in terms of system resource requirements than most other blog servers, but it also simplifies tasks such as backups.

    不需要数据库服务器使Pebble在系统资源需求方面比其他博客服务器更加轻量,它也简化了备份等任务。

    youdao

  • Using the same operating system keeps the compatibility of the resource path names and so on.

    使用相同的操作系统可以确保资源路径名等具有兼容性。

    youdao

  • In general, a partition profile specifies operating system boot time resource requirements, such as the desired amount of memory, processor entitlement, adapters, and so on.

    通常,分区配置文件指定了操作系统启动时的资源需求,例如内存数量、处理器权限、适配器等等。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定