At last, an example of reliability optimization design of the reinforced concrete pillar with the minimum cost is given.
最后给出了设计价格最小的矩形截面钢筋混凝土柱的可靠性优化设计实例。
This paper discusses the problem of the reinforced concrete pillar constructing, its quality requirement and control measure.
本文论述了钢筋砼构造柱在施工中易出现的问题以及质量要求和控制措施。
Who then, if not he, had the right to judge whether a 252-meter (827-foot) reinforced concrete pillar in Vienna should be described as a television tower?
所以除了他,谁还能更有资格来描述一座矗立于维也纳的,高252米(827英尺)的钢筋混凝土柱子呢?
The blasted objectives are scrap iron lump of several tens ton weight, reinforced concrete beam, pillar and side wall respectively. The work-condition is harsh.
这三次爆破目标是重达几十吨的废铁铊、钢筋混凝土梁、柱和边墙,其作业条件苛刻。
The blasted objectives are scrap iron lump of several tens ton weight, reinforced concrete beam, pillar and side wall respectively. The work-condition is harsh.
这三次爆破目标是重达几十吨的废铁铊、钢筋混凝土梁、柱和边墙,其作业条件苛刻。
应用推荐