LOOKING for sea-sand for reclamation project in Singapore.
新加坡寻找海沙用于垦荒。
In fact, after this reclamation project, the tidal influx has reduced 22.57 % since 1934.
而从1934年到漩门二期围垦工程后,纳潮量减小了22.57%。
The result of study proves that the reclamation project of Wenzhou Shoal is technically feasible.
分析研究结果表明,温州浅滩围涂工程是可行的。
Land reclamation planning is the key of the whole Land reclamation project, and also foundations of subsequent works.
土地复垦规划是整个土地复垦工程的关键,也是进行后续工作的基础和直接理论依据。
The general status and geological conditions of the South Guojushi Reclamation Project in Beilun Region are described.
介绍北仑区郭巨峙南围涂工程概况及地质条件。
Through this study, it is hoped to be useful for the reclamation project construction and supplies some reference for the insurance agent.
通过本课题的研究,可为今后围垦工程建设的风险管理提供有益的借鉴,特别是对准备进入这个行业的保险公司具有参考意义。
The group says a land reclamation project has destroyed key wetlands used by the birds on their way from Asia to their breeding grounds in the Arctic.
这个组织称一次土地复垦项目已将从亚洲飞往北极繁殖地途中的重要湿地破坏。
From flow field calculation and sediment analysis to the sea reclamation project of the river, some rules and patterns are obtained on flow field and sediment variations of Lianwan river.
通过对镰湾河填海造陆工程流场计算和泥沙的分析研究,得到镰湾河流场变化及泥沙变化的有关规律。
By means of mathematical models of wave, tidal flow and sediment, numerical study is carried out on deposit-promoting schemes in the reclamation project of Wenzhou shoal at Oujiang estuary.
建立了波浪潮流泥沙数学模型,对瓯江口温州浅滩围涂促淤工程效果进行了数值模拟研究。
Reclamation works will start in 2007, with the project to be finished in 2012.
填海工程将于2007年展开,2012年完成。
This paper is intended to be a useful tool for the planning of any wastewater reclamation and reuse project.
这份文件的目的是成为有用的工具,并规划填海任何废水回收项目。
Mining land reclamation is a very complex systemic project. There are a lot of spatial data and spatial information during the whole procedure.
矿区土地复垦是一项极其综合的系统工程,其整个过程涉及到大量的空间数据与空间信息。
The reclamation area of the Project is 2,550 m2. Together with pontoon moorings, it provides a total area 3,500 m2 of foreshore beyond the existing eastern limit of the Hebe Haven Yacht Club.
工程项目的填海面积为2,550平方米,再加上停船处,在白沙湾游艇会现有东面沿岸地方合共提供3,500平方米的前滨地方。
The District Open Space at Belcher Bay Reclamation as part of the project was completed in August 1998.
卑路乍湾填海区的地区游憩用地建筑工程已于一九九八年八月完成,这是工程计划的一部分。
The seat region of this project belongs to shallow shoal zone of Bohai Sea, where reclamation by pumping filling is under way at present.
本项目所在区域属于渤海浅海滩涂区,目前正在进行吹填造地。
At last, this article USES financial analysis method to demonstrate the feasibility of BOT project and analyzed the risk factors' influence to BOT project in the urban sewage reclamation field.
最后,运用财务评价的方法对以BOT方式建设的城市污水资源化设施的财务可行性和风险进行了分析。
At last, this article USES financial analysis method to demonstrate the feasibility of BOT project and analyzed the risk factors' influence to BOT project in the urban sewage reclamation field.
最后,运用财务评价的方法对以BOT方式建设的城市污水资源化设施的财务可行性和风险进行了分析。
应用推荐