Different kinds of thermohydraulic phenomena during startup of gravity boron injection system (GBIS) of the 200MW nuclear heating reactor (NHR200) were described.
描述了200MW核供热反应堆(NHR-200)重力注硼系统启动时发生的各种热工水力学现象。
To find the available method for rapid startup of EGSB reactor, the start-up of EGSB reactor seeded with anaerobic digestion sludge was investigated.
对接种市政消化污泥的EGSB反应器的启动进行实验研究以寻求快速启动EGSB反应器的有效方法。
A complex anaerobic reactor treating high-concentrated antibiotic wastewater was studied to find out the condition of fast startup and effective control of full-scale facility.
针对复合厌氧反应器处理高浓度难降解有机废水如何创造生产性快速启动条件及反应器的有效控制进行了相关研究。
Casting wheat bran fiber in the startup of IC reactor, can quicken up the curse of sludge granulating obviously and shorten the time wasting at the startup of reactor.
在IC反应器的启动过程中投加麸皮纤维,可以明显地加快污泥颗粒化进程,缩短反应器的启动时间。
The nuclear reactor module further includes one or more heaters configured to add heat to the coolant during a startup operation and prior to the reactor core going critical.
该核反应堆模块还包括一个或多个加热器,这些加热器被配置为在启动操作期间和在反应堆芯变成临界状态之前向冷却剂添加热。
The nuclear reactor module further includes one or more heaters configured to add heat to the coolant during a startup operation and prior to the reactor core going critical.
该核反应堆模块还包括一个或多个加热器,这些加热器被配置为在启动操作期间和在反应堆芯变成临界状态之前向冷却剂添加热。
应用推荐