The function of reactor shutdown system can be simulated by the code to calculate the operating parameters after accidental shutdown.
程序中还引入停堆保护计算模块以模拟反应堆事故停堆后的运行工况。
Thus the operation safety is ensured and sensitivity increased; added UPS as backup power supply ensures safe shutdown and the indication of the reactor power at reactor shutdown.
增设UPS不间断电源作系统安全电源,保证可靠停堆与在反应堆失去全部电源情况下指示堆功率。
One of the key factors in this scenario is determining how the reactor will be shut down because you must shutdown the reactor.
这个方案的一个重要因素就是,它决定了反应堆是如何停止的,因为你们必须停止反应堆。
Nuclear restart For the first time since the Fukushima disaster, a Japanese nuclear reactor that had gone into shutdown has been brought back online.
核电站重启一个在福岛灾难后被停产的日本核电站又重新启动,这种情况自灾难以来还是首次。
But even after shutdown, there is residual heat that needs to be drawn off by cooling water pumped through the reactor core, and that’s where the trouble came.
但是即便终止之后,依旧有余热存在,需要冷却水泵抽水注入反应堆芯将热量散去,这也是问题所在。
Refuelling outage A temporary shutdown of the nuclear reactor unit for carrying out maintenance and overhaul of plant and equipment including the replacement of a portion of used fuel.
指暂时将核反应堆停止操作,以对厂房设备进行维护及大修,并包括更换部份已消耗的铀燃料组件。
In nuclear Power Station, the purpose of the forecast of shutdown date for reactor fuel cycle and evaluation of fuel cycle length is to provide the input for the fuel management.
核电站反应堆循环停堆日期预测及循环长度的评价都是为燃料管理提供设计输入。
The control rods are used to implement quick regulation of the reactor power and emergent shutdown of the reactor in pressurized water nuclear power station.
压水堆核电站依靠控制棒实现反应堆功率的快速调节和特殊情况下的紧急停堆。
The control rods are used to implement quick regulation of the reactor power and emergent shutdown of the reactor in pressurized water nuclear power station.
压水堆核电站依靠控制棒实现反应堆功率的快速调节和特殊情况下的紧急停堆。
应用推荐