Every node in search tree corresponds a RCPSP, and the RCPSP is solved to obtain schedule for the RLP.
搜索树的每一节点对应一个RCPSP,通过求解各节点rcps P来求得rl P的最优调度计划。
The resource-constrained project scheduling problem (RCPSP) is NP problem, most of commercial project management software usually employ simple priority rules for solving the problem.
资源平衡优化问题即资源有限项目调度问题,是一个NP难问题,现在商用项目管理软件系统中的资源平衡优化问题多采用基于优先规则的启发式算法。
Taking transmission design of armored vehicles as an example, this dissertation does research on Resource-Constrained Project Scheduling Problem (RCPSP) for product design and the solving algorithms.
本文以装甲车辆传动装置设计为例,研究产品设计资源受限项目调度规划方法和优化调度问题求解算法。
Taking transmission design of armored vehicles as an example, this dissertation does research on Resource-Constrained Project Scheduling Problem (RCPSP) for product design and the solving algorithms.
本文以装甲车辆传动装置设计为例,研究产品设计资源受限项目调度规划方法和优化调度问题求解算法。
应用推荐