• Simulations show that the provenance based equipment scheduling algorithm increases user satisfaction to 80% compared with the random scheduling algorithm.

    实验结果表明:相对于随机调度算法,基于溯源信息的设备选择算法使得用户满意程度达80%。

    youdao

  • To optimize node selections for grid jobs under de-centralized scheduling frameworks, the algorithm of random multi-start hill climbing is proposed.

    为优化无中心式调度框架下网格作业的节点选择,提出了随机多起点爬山算法。

    youdao

  • The paper describes the feature of the automatic generation system for examination ID CARDS, the strategy of random scheduling and the main algorithm for creating examination ID CARDS.

    论述了考场考证自动生成系统的特点,随机生成考证的策略及考证生成的主要算法。

    youdao

  • The paper describes the feature of the automatic generation system for examination ID CARDS, the strategy of random scheduling and the main algorithm for creating examination ID CARDS.

    论述了考场考证自动生成系统的特点,随机生成考证的策略及考证生成的主要算法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定