The technology of power adjusting is one of the key technologies of fuel rod ramp test.
燃料棒功率瞬变调节技术是燃料元件堆内瞬态行为试验研究中的关键技术之一。
DIN 51130 Testing of floor covering-Determination of the anti-slip properties-Workrooms and fields of activities with slip danger, walking method-Ramp test.
DIN 51130地板覆盖物的试验-防滑性能测定有滑跌危险的工作间和工作区-踩踏法-斜坡试验。
Our first 100 K test was defined to ramp up to 60 K at the same rate as the single server test, then to slow down the users being added.
第一个100K测试被定义为以和单个服务器测试相同的速度增加到60 K,然后放缓增加用户的速度。
These successes lead led to the anticipated benefits of improved full software verification team (SVT) ramp-up time and improved product quality at full system test entry.
这些成功导致(led)了在完整的系统测试开始时改进了的完整的软件验证团队(SVT)的加速的时间,以及改进了的产品质量的预期好处。
You can enter custom start and stop times to filter out data from the ramp-up or ramp-down phases of test runs.
您可以键入自定义的起始和终止时间,从这个测试运行的倾斜上升或者倾斜下降的阶段过滤出数据。
Each performance test consisted of a ramp-up period, followed by a period with a full user load.
每一个性能测试都由一个过渡时期组成,接着一个全用户负荷时间。
We ran each test for approximately 60 minutes in a steady state, with a ramp-up period of 5 minutes.
我们在稳定状态下每次测试运行约60分钟,自举(ramp up)周期为5分钟。
By comparing the advantage and disadvantage of ramp current with other methods, ramp current method and up-and-down method are used to test sensitivity of bridge-wire Electrical Initiating Device.
对动态斜坡法与升降法测试原理优缺点进行了比较,在动态斜坡法测试敏感和钝感型电火工品发火感度试验的基础上,结合与升降法试验结果的对比,对动态斜坡法进行了研究。
By comparing the advantage and disadvantage of ramp current with other methods, ramp current method and up-and-down method are used to test sensitivity of bridge-wire Electrical Initiating Device.
对动态斜坡法与升降法测试原理优缺点进行了比较,在动态斜坡法测试敏感和钝感型电火工品发火感度试验的基础上,结合与升降法试验结果的对比,对动态斜坡法进行了研究。
应用推荐