• For the ram compaction piles with composite bearing base, the speed of drawing pipe must be controlled, so as to avoid the gapping or the cut-off.

    复合载体施工过程中,一定控制速度以免出现缩颈断桩现象。

    youdao

  • By using the special ram-extruder, the temperature and pressure in the extrusion course can be ensured and the pipe of high quality and low cost can be obtained.

    使用专用柱塞挤出机,保障挤出过程所需温度压力可以得到性价比管材产品。

    youdao

  • Through static loading contrast tests, it is found that the bearing capacity of ram-enlarged pile is higher than that of pipe-sinking cast-in-situ pile when both are tested under the same conditions.

    通过静压对比试验,得出条件基本相同时承载力大于灌注桩

    youdao

  • Through static loading contrast tests, it is found that the bearing capacity of ram-enlarged pile is higher than that of pipe-sinking cast-in-situ pile when both are tested under the same conditions.

    通过静压对比试验,得出条件基本相同时承载力大于灌注桩

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定