Under O. 3 r. 5 (1), the Court has power to extend or abridge the relevant time period.
高等法院第3号命令第5(1)条规则赋予法庭延展或缩短有关期限的权力。
Later in the report, current code provisions relevant to steel shear walls are presented and new R-Factor and other design parameters are proposed for steel shear walls.
在那些报告内过后,给钢抗剪力墙相关的当今代码规定被提出和新r原素和其他设计参数被为钢提议抗剪力墙。
Later in the report, current code provisions relevant to steel shear walls are presented and new R-Factor and other design parameters are proposed for steel shear walls.
在那些报告内过后,给钢抗剪力墙相关的当今代码规定被提出和新r原素和其他设计参数被为钢提议抗剪力墙。
应用推荐