The installation 1, Qudiao flange end of the Flange-connection fixed ball valve protective cover on both sides, in the valve fully open state to wash clean.
安装1、取掉法兰端两边的保护盖,在阀完全打开的状态下进行冲洗清洁。
The installation 1, Qudiao flange end of the Flange-connection fixed ball valve protective cover on both sides, in the valve fully open state to wash clean.
安装1、取掉法兰端两边的保护盖,在阀完全打开的状态下进行冲洗清洁。
应用推荐