• The quantity schedule, a section in the cost of production report, is the vehicles used to show physical flow.

    生产数据汇总中的数量部分分析产品实际流动情况有利工具。

    youdao

  • Moody's warns that big programs, particularly those behind schedule or over budget are vulnerable to quantity reductions, deferrals or in some cases, cancellation.

    穆迪公司大型项目提出警告特别是那些落后于预定计划超出预算的项目,面临数量减少延期或因某些情况取消等不利因素时脆弱的。

    youdao

  • For example, priority could earth natural itself demand, develop a plan to produce district, schedule of total population within a certain period required for consumption quantity of products.

    比如说优先考虑地球自然人本身需求制定计划按期生产出各区总人口一定期间内所需消费数量的产品。

    youdao

  • Demand, develop a plan to produce district, schedule of total population within a certain period required for consumption quantity of products.

    需求制定计划按期生产出各区总人口一定期间内所需消费数量的产品。

    youdao

  • The quality, quantity, unit price, packing and delivery schedule shall also be specified in an additional contract, which shall constitute an integral part of this contract.

    彩电质量数量单价包装交货日程安排由双方另行签订合同,作为合同不可分割一部分。

    youdao

  • When you are selling and have accepted a purchase or an order, or when the buyer has paid, always deliver the good or service according to the agreed quantity, quality, and delivery time schedule.

    接受了别人购买订单别人付了钱,就一定货物服务按照约定数量质量时间供应

    youdao

  • Through active promotion of the standard, production and construction requirements on power material procurement are met in quality, quantity and delivery schedule and the procurement cost is lowered.

    通过积极推行标准达到保证电力物资采购质量数量、供贷时间满足生产建设要求,并降低采购成本

    youdao

  • Construction design includes: a list of projects in terms of Quantity Price (Business standard), standard construction techniques, construction schedule and construction plan preparation.

    施工设计包括清单工程量计算、工程量清单报价(商务)、施工技术标、施工进度计划施工平面图编制

    youdao

  • Considering the large work quantity and tight time schedule for the curtain grouting in Bid I of Letan project, drilling speed is the most critical factor in the construction progress.

    水电站I工程帷幕灌浆工程量,工期,影响施工速度最大因素钻孔速度。

    youdao

  • Countermeasures:(1) Using feedback chart, reasonably plan Pilates course quantity and schedule. (2) In the group mat class, using different level class, or mixed class with limited person;

    对策:(1运用会员反馈调查表合理安排普拉提项目课时课程时间。(2团体上课采用分级别授课形式,混合授课进行人数限制;

    youdao

  • Countermeasures:(1) Using feedback chart, reasonably plan Pilates course quantity and schedule. (2) In the group mat class, using different level class, or mixed class with limited person;

    对策:(1运用会员反馈调查表合理安排普拉提项目课时课程时间。(2团体上课采用分级别授课形式,混合授课进行人数限制;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定