Abstract:First, based on the incomplete contract theory, summarizes the main factors of difference of quantities that including the engineering change, List missing item and quantity deviation.
摘要:首先,基于不完全契约理论,总结引起工程量差异的工程量清单缺项、工程变更等主要因素;
Abstract:First, based on the incomplete contract theory, summarizes the main factors of difference of quantities that including the engineering change, List missing item and quantity deviation.
摘要:首先,基于不完全契约理论,总结引起工程量差异的工程量清单缺项、工程变更等主要因素;
应用推荐