• QC group of copper beneficiation plant, Dabosan Mine Co. , Ltd.

    广东省大宝山矿业有限公司厂选矿QC小组

    youdao

  • QC Group of Technology, the Seventh Oil Production Plant, Daqing Oilfields.

    大庆油田第七采油厂工艺QC小组

    youdao

  • QC Group of Green Operation, Shengli Oil Production Plant, Shengli Oilfield Sub-Company.

    胜利油田分公司胜利采油厂绿色作业QC小组

    youdao

  • QC Group of Styrene Workshop, Chemical Plastic Factory, Wushun Petro-Chemical Corporation.

    抚顺石化公司化工塑料厂苯乙烯车间QC小组

    youdao

  • QC Group of Styrene Workshop, Chemical Plastic Plant, Fushun Petroleum and Chemical Company.

    抚顺石化公司化工塑料厂苯乙烯车间QC小组

    youdao

  • QC Group of Nuclear and Magnet, Logging Branch, Changcheng Drilling Engineering Limited Company, China Petroleum Groups.

    中国石油集团长城钻探工程有限公司录井公司核磁QC小组。

    youdao

  • It has realistic instruction significance for present QC group activity development in electric power generation industries.

    本文现今发电企业开展QC小组活动现实指导意义

    youdao

  • QC Group "Tuanjie", the Center of Study and Development, the Branch of Repair and Maintenance, China Petroleum Pipeline Bureau.

    中国石油管道局维抢修分公司研发中心团结QC小组

    youdao

  • QC Group of Undamaged Detection, Sub-company of Pipeline Technology Operation, Storage and Transportation company, SINOPEC Group.

    中国石化集团管道储运公司管道技术作业分公司无损检测QC小组

    youdao

  • Persistent conduction of mass QC group activities has led to a higher QC level of the hospital and better delivered services to patients.

    通过坚持此项工作,提高医院质量管理水平从而更好地为患者服务

    youdao

  • The paper introduced that QC group through three times circulation of PDCA to achieve improving narrow pulse ick-off equipment China percent of pass.

    本文详细介绍了QC小组通过PDCA循环实现提高脉冲截尾器国产化合格率

    youdao

  • QC Group of Small Parts, Rivet Welding Sub-Factory of the Fourth Mechanical Factory, Jianghan Petroleum Management Bureau, China Petro-Chemical Groups.

    中国石化江汉石油管理局第四机械厂铆焊分厂小件QC小组

    youdao

  • As a kind of quality improvement method introduced into China since 1978, QC group activity is playing significant function in all trades and professions.

    质量管理小组活动作为质量改进方法1978年引进我国后,现已各行各业发挥巨大作用

    youdao

  • QC group activity not only bring to enterprises improvement of economic benefits and outstanding achievement, but also train technical and management talents.

    QC小组活动企业带来经济效益业绩改善同时为企业培养和锻炼了技术管理方面的人才。

    youdao

  • QC Group of Mechanical Repair Workshop, Manufacturing Factory of Metallic Containers, Oilfield Construction Engineering Company, Jianghan Petroleum Administration Bureau.

    江汉石油管理局油田建设工程公司金属容器制造厂机修车间QC小组

    youdao

  • We have a very well-trained worker. Very excellent QC group, what we provide isn't only an only good price, but better product quality and make you of satisfied after-sales service.

    非常优秀的QC团体我们提供不仅仅是好的价格而是更好产品质量满意售后服务

    youdao

  • It also makes probe and attempt to how to spot check excavator, how to determine content of spot check and how to harmonize with QC group of overall quality management in his own opinion.

    自己理解对铲运机如何点检?点检内容怎么确定?全面质量管理QC小组活动怎么衔接等方面探索尝试

    youdao

  • In order to increase awareness of high blood pressure, enhance health awareness, reduce the incidence of stroke, we carried out QC group activities and achieved the purpose of the health education.

    为了提高患者对高血压认知增强保健意识从而降低卒中的发病率通过QC小组活动达到了健康宣传的目的

    youdao

  • Representative from the mining group of 18 participated in the on-site QC release.

    来自矿区有代表性18个QC小组参加现场发布

    youdao

  • Restructuring and the establishment of a new department structure, the original upgrade to QC inspection group, the original board room upgrade to a technology center.

    重组建立新的部门结构,将原来质检升级质检部,将原来的板房升级为技术中心。

    youdao

  • Since 2000, Huaibei Mining Group were registered 1056 QC, employees over 9187 people participated, and achieved 1205 results.

    2000年以来,淮北矿业共注册1056个QC小组参加员工9187人次,取得1205项成果。

    youdao

  • There are more than 600 people working in Jie MeiMei group; 25 Senior Manager, 30 Technician; 50 QC Inspectors.

    公司现有员工600中高级管理人员25人,技术专职人员30人,品质管理人员50人。

    youdao

  • September 20, Huaibei Mining Group in 2010 results conference QC phase palace in the Hotel.

    9月20日淮北矿业2010年QC小组成果发布会王府宾馆举行。

    youdao

  • September 20, Huaibei Mining Group in 2010 results conference QC phase palace in the Hotel.

    9月20日淮北矿业2010年QC小组成果发布会王府宾馆举行。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定