Equipments and materials cannot be put in storage until they are verified and the form Acceptance Sheet for Incoming Products has been filled.
设备、材料必须经验收合格并填写“进货验收单”后方可入库。
Through these measures, loose selvage was resolved, weft stoppage is reduced, and loom efficiency and first grade percentage put in storage are enhanced.
通过在以上各方面采取措施,解决了松边问题,降低了纬向停台,提高了织机效率和产品的入库一等品率。
Loom efficiency can reach 85% and first grade percentage put in storage can reach 98.5% through adopting effective measures in processing, equipments and operation.
通过在工艺、设备和操作上采取有效措施,织机效率达到85%,入库一等品率达到98.5%。
Loom efficiency can reach 85% and first grade percentage put in storage can reach 98.5% through adopting effective measures in processing, equipments and operation.
通过在工艺、设备和操作上采取有效措施,织机效率达到85%,入库一等品率达到98.5%。
应用推荐