• "So I did get a little caught off-guard when they went from their [ProLiant] G1 model to their G6 model," Bourassa says.

    所以他们G 1型号升级他们G6型号时,确实有点措不及防。

    youdao

  • Check storage system power switch and cables. Turn the system power off while checking the ProLiant power and cable connections, then turn the system power back on to retry.

    系统断电,必须首先断开所有外部存储系统电源之后才能切断服务器电源。

    youdao

  • Check storage system power switch and cables. Turn the system power off while checking the ProLiant power and cable connections, then turn the system power back on to retry.

    系统断电,必须首先断开所有外部存储系统电源之后才能切断服务器电源。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定