When performing a Project-Clean operation, it can take a long time to perform validation on objects such as large industry schemas.
在执行项目清理操作时,对于诸如大型行业模式等对象,执行验证会花很长的时间。
Some have a need for auditability of changes, project history, and other strict compliance validation such as e-signatures.
有些需要变更审核、项目历史和其他像电子签名等严格的遵守确认。
You can turn off JSP validation at the project level by right clicking the project and selecting properties.
可以在项目级关闭jsp验证,方法为右键单击该项目,然后选择属性。
This model can help you to envision the needs for loading priorities, UMF organization, validation, notification and logging early, thus simplifying the project.
这个模型可以帮助您更早地预见加载优先级、U MF组织、验证、通知与日志记录方面的需求,从而简化项目开发。
Especially during testing, unseparated requirements add an extra burden to your project because precise validation and verification of the requirements are more cumbersome.
特别是在测试阶段,未被分离的需求将给整个工程带来额外的负担,因为此时对需求进行精确的确认和查证是一件非常麻烦的事情。
It is available from any element with validation errors or warnings, for elements in both the Project Explorer and on the diagram.
它可以从带有验证错误和警告的元素中得到,这些元素可以是ProjectExplorer中的或者是图表上的。
Project system integration: item template for.edmx file, model generation wizard, EdmxDeploy.exe, and Entity Framework validation on build.
项目系统集成:.edmx文件模板,模型生成向导,EdmxDeploy . exe和EntityFramework构建时的验证。
To begin creating a validation project, Lifecycle Manager collects information from each Cognos BI environment that it will connect to.
要开始创建一个验证项目,LifecycleManager需要从它将连接到的每个CognosBI环境中收集信息。
At the time the project is created for validation between two instances of Cognos BI, it is a best practice that both environments be available.
在创建用于两个CognosBI实例之间的验证的项目之时,最佳实践是同时提供两个环境。
If you want enhanced data validation classes and forms processing, add clear.swc to the project build path.
如果你想要增强的数据验证类和表单处理,只需将clear . swc添加到项目的构建路径中即可。
I encourage you to check out the Morphia Google Code project for information about its data access object (DAO) support, validation, and manual mapping capabilities.
要获得有关其数据访问对象(Data Access Object,DAO)支持、验证和手动映射功能的信息,我鼓励您查看MorphiaGoogleCode项目。
On a recent project, a client who had many XML formats hired me, through my company Fourthought, to develop schemata for documentation and validation for these XML formats.
在最近的一个项目中,一个客户有许多xml格式,他通过我的公司Fourthought聘用我去开发用于记录和验证这些xml格式的模式。
The *.properties files, kept in the class path of the project, contain key-value pairs and are used as a resource bundle to get the locale-specific runtime-resolved validation messages.
这些 *.properties文件保存在该项目的类路径中,文件内包含键-值对,并可用作资源包来获得特定于本地语言环境的运行时解析的验证消息。
In our case project, we use Rational ClearQuest to collect data input, and we use Jmystiq to make automatic validation by creating some logic rules.
在我们的案例项目中,我们使用RationalClearQuest来采集数据输入,并通过创建一些逻辑关系使用Jmystiq来实现自动确认。
If a project is not utilizing use case requirements, then tests can still be derived from the validation of initial requirements.
如果一个项目没有使用用例需求,那么仍可以从确认初始需求说明中得到测试。
This project has separate and serial processes which they call "design", "development", "validation" etc., and the Kanban CARDS move between processes.
项目被分解成“设计”、“开发”、“验证”等连续的工序,而看板卡就在这些工序之间移动。
Manage the Validation program for the project, including planning, training, metrics, priorities, resources, etc.
管理项目的验证程序,包括计划、培训、度量指标、优先顺序、资源等。
Support the procurement, installation, commissioning and validation of new instrument and laboratory Capex project.
参与新仪器的采购,安装,调试,验证,及实验室建设项目。
During subsequent project phases, further validation and development of the project scope for that phase is performed.
随后在各项目阶段,要进一步审核和细化本阶段的项目范围。
Software reviews can be used in supporting of the objectives of project management, system engineering, verification and validation, configuration management and quality assurance.
软件评审可以用于支持项目管理、系统工程、验证和确认、配置管理和质量保证的目标。
Traditional software development method is difficult to support software requirements validation at early stage, which often leads to project uncontrollable.
传统软件开发方法因难以支持需求的早期验证而易导致项目失控。
Traditional software development methodology is difficult to support software requirements validation at early stage, which often lead to project uncontrollable.
传统软件开发方法因难以支持需求的早期验证而易导致项目失控。
Crowd funding is known to offer project creators exposure, social proof, market validation, a loyal customer following, as well as funding.
众筹凭借为项目发起人们提供宣传渠道、社会认可、市场认证,赢得忠实顾客群以及筹资而闻名。
Handling these events puts all of your validation code in a single location, rather than scattering it throughout your project.
处理这些事件时会将所有验证程序码置于单一位置,而不是将它四散于专案各处。
In the case of a successful campaign, market validation is received and presales are made before commitment is required on the part of the project creator.
在一个成功的项目中,项目必须经市场验证并完成预售后,才要求项目发起人作出保证。
Responsible for process equipment related project organization and validation, ensure project delivered within planed time, quality and budget.
负责生产设备相关项目组织实施及验证工作,确保质量的稳定及在计划的时间内,按预算完成。
Contribute or lead to the new project and validation of heat seal area, and make the new parts to normal mass production.
根据编制的作业指导书,组织热封区域生产部人员的各类技术、技能、安全和素质的培训。
Contribute or lead to the new project and validation of heat seal area, and make the new parts to normal mass production.
根据编制的作业指导书,组织热封区域生产部人员的各类技术、技能、安全和素质的培训。
应用推荐