Decreases project time by moving some tasks from Construction to elaboration.
通过把一些任务从构造阶段移到精化阶段来缩短项目时间。
They include an e-commerce storefront app, a community Web site, a portal site, sample reports, and a project time-tracking app.
其中包括一个电子商务店面应用程序、一个社区Web站点、一个门户站点、示例报表和一个项目时间跟踪应用程序。
It can also remove many issues that are related to compilation, classpath, or properties; these issues can cost a lot of project time and money.
它还可以消除与编译、类路径或属性相关的很多问题;这些问题可能会耗费大量的项目时间和资金。
At Piehead, we build web applications on a faster pace than almost any startup, and there is very little difference in total project time between the platforms we use.
在Piehead,我们以比几乎任何创业公司更快的节奏创建Web应用程序,而在我们使用的不同平台之间,总的项目耗时只有极细微的差距。
ARC focuses on simple yet critical goals: improving clients' return on assets, operational performance, total cost of ownership, project time-to-benefit, and shareholder value.
ARC专注于帮助客户实现简单但却具有关键意义的企业目标,包括提高客户资产收益率、运营绩效、降低总体拥有成本、缩短项目见效周期、提升股东收益。
Diligence as measured by completion of most of the problem sets and by presence in the laboratory during final project time.
通过完成大多数作业以及在期末专题期间在实验室的出勤的情况反映出的个人努力。
The problems of optimizing cost and project time limit occur when the curve of the project cost and project time is nonlinear.
探讨了工程成本与时间曲线为非线性时,成本与工期的优化问题。
There are project summary, compilation foundations, construction plan, hoisting management, safety measures, project time limit and emergency plan etc.
其中包括工程概况、编制依据、施工方案、吊装管理、安全措施、计划工期和应急预案等。
This thesis analyses and research project scope management and project time management of the game software development with the modem project management knowledge and theory.
本文运用现代项目管理知识和理论,对游戏软件研发的范围管理和进度管理这两大主要管理方面进行了分析研究。
To workout project plan based on above information and the priority of the projects. Be responsible for re-planning project time to time to meet the changes of customer's requirement.
根据以上信息及项目优先权编制项目计划,并及时根据客户的要求调整计划。
In accordance with the characteristics of expansion project of Huanglongtan Power Plant, the optimized plan for the construction was designed and the project time schedule was guaranteed.
根据黄龙滩电厂扩建工程的特点,设计了工程建设的优化方案,确保了工期目标。
The GERT network can solve not only the project time optimization problem in making bridge construction plan, but also the cost optimization in the limit of proper project time and resource.
随机网络不仅可以解决桥梁施工计划的工期优化问题,而且在合理工期和限定资源条件下,可进行施工成本优化。
Project time management in communication engineering design is introduced in detail, and critical points on drawing engineering network diagram are presented.
介绍了通信工程设计中项目时间管理的组成及实施方法,并结合工程实际详细说明了网络图的绘制要点。
Rapid project initiation: Once a decision has been made to initiate a project, time is usually a precious commodity.
项目快速初始化:一旦决定开始一个项目,时间通常是最宝贵的东西。
Based on the results of this project, time spent on a transition phase from waterfall development to agile development is encouraged.
根据此项目的结果,鼓励花费在从瀑布开发到敏捷开发的过渡阶段上的时间。
Based on the results of this project, time spent on a transition phase from waterfall development to agile development is encouraged.
根据此项目的结果,鼓励花费在从瀑布开发到敏捷开发的过渡阶段上的时间。
应用推荐