For an iterative project, test management will have to provide the foundation and guide the effort to plan, execute, and evaluate testing iteratively.
对于一个迭代的项目,测试管理将必须提供基础并重复地指导计划、执行和测试评估。
It is configurable but by default it shows the status of test execution by test plan within your project.
它是可配置的,但默认显示项目中基于测试计划的测试执行的状态。
Once you have that set up, if you select a test team within a plan, you can see which team members are assigned to this project (as shown in Figure 12).
一旦您开始了创建,如果您选择了一个计划内的测试团队,那么您可以查看是哪个团队成员分配给了该项目(同样见于图12)。
The next logical step is to use the information that you have captured in your test plan while executing your project.
接下来逻辑化的一步,便是使用您在执行项目时在测试计划中获取的信息。
These test levels can be coordinated by means of a master test plan (at the project level) and an iteration test plan (at the iteration level).
这些测试级别可以是并列的,这取决于主测试计划(在项目级)和迭代测试计划(在迭代级)。
RUP USES a master test plan for the overall project and an iteration test plan per iteration.
RUP对整个项目使用一个主测试计划,对每个迭代使用一个迭代测试计划。
Test motivators are documents that may relate to the test effort, such as a project schedule, a requirements document, or a project plan.
测试激发因素是和测试努力相关的文档,例如一个项目进度表、一个需求文档、或者一个项目计划。
The default test plan template included in Rational Quality Manager provides several features that assist you both in knowing where the test project is and communicating it to others.
Rational QualityManager中包含的默认的测试计划模板提供了帮助您了解测试项目在哪,以及帮助您与其他人交流测试项目的许多特性。
If you want to link test Plan Records, or other test assets with these 'project drivers' then you would establish a file location for your test motivators.
如果您希望通过这些“项目驱动器”链接到Test PlanRecords或者其他的测试资产,那么您应当为您的测试激发因素建立一个文件位置。
That is what a test strategy is all about: it is your way of telling the rest of the project team what you will and will not be testing, and how you plan to do that testing.
这就是测试战略的全部:它是一种您告诉团队成员您想要测试什么以及不想测试什么,下一步您准备怎么做的方式。
The design document is the guide of the whole project. According to this document, we can also create the operation operating manual, the test plan and the test case.
本说明书是整个软件设计的依据,它对以后阶段的工作起指导作用。同时本说明书还是《用户手册》和《测试计划》的编写依据。
You can also associate each test project with a different data generation plan, deployment configuration, and connection string.
还可以将每个测试项目与不同的数据生成计划、部署配置和连接字符串关联。
Generate test data prior to running unit tests check box to apply a data generation plan to your database project before you run tests.
“在运行单元测试前生成测试数据”复选框,以在运行测试前向数据库项目应用数据生成计划。
Finally introduces CRM system clues and business opportunities of the management subsystem of needs analysis and project plan and its design, development, operation and test, etc.
最后详细介绍了CRM系统线索与商机管理子系统的需求分析和项目方案以及其设计、开发、运行和测试等内容。
You can associate each test project with a different data generation plan, deployment configuration, and connection string.
您可以将每一个测试专案与不同的资料产生计划、部署组态和连接字串产生关联。
Create a data generation plan: Create a data generation plan for each unit test project or for specific application tests.
生成测试数据:预览并验证将生成的数据之后,您可以运行数据生成计划以生成测试数据。
When you create the test project, you can configure test Settings (such as the connection string), deployment Settings, and a data generation plan to use for that project.
当您建立测试专案时,可以进行测试设定(例如连接字串)、部署设定以及资料产生方案,以使用该专案。
Committing project cost and time-plan targets, as well as test-coverage, test-yield and test-time targets, within the PTD projects.
负责生产测试开发项目的成本、时间计划指标,以及测试覆盖率、测试通过率和测试时间指标。
You can define unit tests to verify the behavior of your database objects and associate each test project with a different data generation plan, deployment configuration, and connection string.
您可以定义单元测试来验证资料库物件的行为,以及将每一个测试专案与不同的资料产生计划、部署组态和连接字串产生关联。
You can define unit tests to verify the behavior of your database objects and associate each test project with a different data generation plan, deployment configuration, and connection string.
您可以定义单元测试来验证资料库物件的行为,以及将每一个测试专案与不同的资料产生计划、部署组态和连接字串产生关联。