All these results have great value on choosing the treating process of the regenerated papermaking wastewater, determining the project scale, and estimating the effect of anaerobic treatment.
此结果对于该类造纸工业废水治理工艺的选择、工程规模的确定及废水处理效果估计具有重要的参考价值。
The Nuozhadu Hydropower Station is huge in project scale and complex in engineering geological conditions and has weak tectonic zones on the right bank of its dam site.
糯扎渡水电站工程规模巨大、枢纽区工程地质条件复杂,坝址右岸分布有构造软弱岩带等。
The Xiaowan Hydropower project will have lots of some uncertainties in its construction due to its natural environment, geological conditions, as well as project scale etc.
小湾水电工程所处的自然环境、地质条件及工程规模等特点给工程建设带来了许多不确定性。
Project scale: the construction scale for the project is to build a butchery to butcher 50000 heads of separated perfect beef cattle and a fattening farm to fatten 5000 heads of beef cattle.
专案建设规模及内容:建设规模为年屠宰分割优质肉牛5万头的屠宰厂和年育肥肉牛5000头的肉牛育肥场各一座。
Project scale: the construction scale for the project is to build a butchery to butcher 50000 heads of separated perfect beef cattle and a fattening farm to fatten 5000 heads of beef cattle.
专案建设规模及内容:建设规模为年屠宰分割优质肉牛5万头的屠宰厂和年育肥肉牛5000头的肉牛育肥场各一座。
应用推荐