项目资源变更。
Project resource management system is an integral component of project resource system.
项目资源管理系统是项目管理系统中不可缺少的组成部分。
If you localize your project, you will want to create localized versions of the project resource file.
如果对项目进行本地化,则会希望创建项目资源文件的本地化版本。
For example, if you select a project resource, each program part that is at the top level of an.eglbld file stored in the project is presented for you to select.
例如,如果您选择了一个项目资源,它会显示存储在项目中的.eglbld文件的顶层的每个程序部件以供您选择。
Project attributes provide an effective way to differentiate the resource demand on these proposals, based on the last milestone achieved.
基于到达的上一个里程碑,项目属性提供了一个有效的方法来区分这些建议需要的资源。
In my experience, there is a primary risk that drives project managers to consider overlapping iterations: the resource utilization risk.
在我的经历中,遇到过一个主要的驱使项目经理考虑重叠迭代的风险:资源利用风险。
Your business modules and the enterprise service discovery wizard will use this resource adapter project.
业务模块和企业服务发现向导将使用此资源适配器项目。
There is now a resource adapter project in your workspace.
现在,您的工作区内便有了一个资源适配器项目。
An IT director who secures a project by underplaying the resource and time requirements might expect the project to make him look good and gain him a promotion.
一个通过对资源和时间需求轻描淡写来保护一个项目的IT指导者可能期望该项目能使他体面并令他晋升。
Import the resource adapter and create an adapter project.
导入资源适配器并创建一个适配器项目。
An equitable commitment between the resource provider and the project delivery team must exist before a viable project exists.
在可行的项目存在前需要在资源提供者与项目交付方之间有一个公平的约束。
Base calendars are templates that project calendars, task calendars, and resource calendars are derived from.
项目日历、任务日历、资源日历都是从标准日历这个模板派生出来的。
The EPMO "owns" the organization's project managers, and acts as a resource management function for them.
EPMO“拥有”组织的项目经理,并且作为它们的资源管理职能部门。
Note that "senior resources" are specified to minimize the impact of poor resource quality on the project estimate.
注意到这里指明了“高级资源”以减少较差的资源对项目评估的影响。
The project will help address major infrastructure and resource constraints faced by Hainan province.
本项目将协助克服海南省面临的基础设施和资源两大制约因素。
Once the resource is assigned to a project, they now have two managers: the project manager for the IT project and the resource owner for analysts.
一旦将资源分配到项目中,他们就有了两个经理:IT 项目的项目经理和分析人员的资源所有者。
Expertise is often required in building a project plan that Outlines all of the tasks that will be required for your portal project, so you seriously want to consider how you resource your project.
在制订列出门户项目所需的全部任务的项目计划时,常常需要专业知识,因此,您肯定需要考虑如何安排项目的资源。
RUP also completely ignores some important project management-related activities, including people management, resource planning and estimation, escalation, and contact management.
RUP还完全地忽略了一些与项目管理相关的重要活动,包括人员管理、资源计划和估算、扩大,和联系管理。
Create a new J2EE connector project on your workspace by importing the resource adapter (RAR file).
通过导入资源适配器(RAR文件)在工作区内创建新J 2ee连接器项目。
If you're managing a project, figure out what the scarce resource is (it's not usually money).
当你在做一个项目时,先看看你有什么稀有资源(通常不会是钱)。
Provide project managers with greater visibility and insight into development activities for more effective project management and resource capacity planning.
提供给项目经理更大的可视性,并有助于对更加有效项目管理和资源性能规划的深刻见解。
It is highly probable that the ideal resource is engaged in another project and is not going to be available at the exact moment of need.
理想的资源很有可能被用在另一个项目中,无法在需要的时间准确地提供给本项目。
Project management requires a way to effectively plan, track, and manage all aspects of GDD project and resource portfolios.
项目管理需要一种有效的方法进行计划、追踪并对GDD项目所有方面及资源组合进行管理。
Create a project using the RAR file of the SAP resource adapter.
使用SAP资源适配器的RAR文件创建项目。
When project tasks thin out, the resource manager ensures that the employee can work on a different project part time.
当项目任务很少时,资源经理会确保雇员临时为不同的项目工作。
This can help reduce the risk of the project and may also reduce resource requirements, a combination of which can bring down the price of the bid.
这有助于减少项目风险,并可能降低资源需求,这两者结合起来,可以降低竞标价格。
The best way to verify the configuration is correct is to create a project for the new resource pool.
验证该配置的最佳途径是创建一个新资源池项目。
Every time a change in a project (such as creation, deletion, or resource updating) occurs, it's handled by builders.
项目中每发生一次更改(例如创建、删除或资源更新),都是由构建程序来处理。
The concepts demonstrated in this article have a specific use case; however, the underlying model is one of Lotus Domino resource modeling using Project Zero.
本文演示的概念有一个具体的用例;但是,其底层模型是使用ProjectZero对LotusDomino进行资源建模的一个例子。
Project Crossbow brought virtualization and bandwidth resource control into the network stack to minimize complexity and overhead.
ProjectCrossbow 将虚拟化和带宽资源控制带入到网络栈中,最小化复杂性和开销。
应用推荐