• Under FIDIC condition of contract, the project progress control mainly includes project progress management, project delay and project extension stipulation.

    在FIDIC合同条件下,工程进度的控制主要包括有关工程进度计划管理和工程延误、工程延期的规定。

    youdao

  • The paper introduces the measures on project progress control following the stipulations specified in the contract and the actual situation for those highway network improvement projects.

    介绍了路网工程中根据合同及实际情况控制进度目标的措施。

    youdao

  • In the process of contracting, these risks will produce a great influence on the project progress, its cost and quality control.

    在工程承包过程中,这些风险因素都可能给工程进度、费用、质量的控制造成极大影响。

    youdao

  • At first, this paper introduced the overview of the project, and then analyzed its characteristics, importance and difference, and pointed out it 's the most crucial part to control the progress.

    本文首先介绍了本项目的概况,在此基础上分析了项目工程的特点和施工重难点,指出项目进度控制是实施该项目的最关键部分。

    youdao

  • Three controls were usually emphasized in the engineering project implementation process: quality control, progress control and cost control.

    工程项目实施过程中通常强调三大控制:质量控制、工期控制、成本控制。

    youdao

  • The key of low cost strategy for a petroleum engineering project is to effectively control the project progress, its cost and quality.

    石油工程项目实施低成本战略,关键是对项目的进度、成本与质量进行有效地控制。

    youdao

  • The success or failure of the software project depend on the developing course control in a great extent, this includes control in quality, source code, progress, fund, personnel, etc.

    软件项目的成败在很大程度上取决于对其开发过程的控制,这包括对质量、源代码、进度、资金、人员等的控制。

    youdao

  • EVM, as a new project integrated management technique, is able to manage integratively and control product development progress, cost, quality and technique.

    而挣值管理作为一种新兴的项目集成化管理技术,能够实现产品研发进度、成本、质量和技术的综合管理与控制。

    youdao

  • In construction management of expressways, the contractor to the control goal of the project progress, the project costs and the project quality is playing a very important role.

    在高速公路建设过程中,承包商对工程项目的进度、费用、质量控制目标起着至关重要的作用。

    youdao

  • Finally, to control the whole progress from the BPR project progress tracking, performance evaluation, and the activities change, and ensure to realize the BPR project final goals.

    五是对BPR项目进度从进度跟踪、绩效考核、活动变更三个方面进行过程控制,确保BPR项目目标的实现。

    youdao

  • Measuring true progress and quality sometimes seems a burden during a project, but good tools create an environment that makes quality control seem natural.

    有时,衡量真实进度和质量看似项目的负担,但是好的工具能创造出一个环境,让质量控制变得简单自然。

    youdao

  • ABSTRACT: This paper introduced the progress control process of initial energization in AP1000 Sanmen Project, and provided the analysis direct at schedule variance appeared.

    摘要:介绍ap1000三门项目首次倒送电的整体进度控制过程,并针对现场执行过程中执行计划与基准计划的偏差进行分析。

    youdao

  • Third, project control management of network enterprise is researched, including the progress control management, cost control management and quality control management.

    其三,重点研究了网络企业项目控制管理,包括进度控制管理、成本控制管理和质量控制管理。

    youdao

  • The Xiaolangdi water control project is constructed in smooth progress with its major items all along keeping in advance of the contractual schedule.

    小浪底水利枢纽大坝工程施工进度进展顺利,各主要项目一直超前合同目标计划。

    youdao

  • Equipment system is an important part in the railway transit project. It is a crucial item for the owner how to control the progress of equipment system.

    设备系统是轨道交通工程建设的重要组成部分,如何控制轨道交通工程中的设备系统的进度,成为轨道交通工程业主的一项关键课题。

    youdao

  • In this way, the data collected or the project progress can be displayed to us visually. So, we can find the problem or control the progress efficiently.

    采用这种方法,可以直观的将现场采集数据或工程进度展现在人们面前,从而可以很有效地发现问题或掌握进度。

    youdao

  • Cost control is an important component of cost management of the project, of which the most important implementation is to integrated control costs and the progress of the construction.

    成本控制是项目成本管理的一个重要环节,在项目成本管理实施中最重要的控制要点就是对成本与进度的集成控制。

    youdao

  • Application for project network technology to develop project plan, and control the progress of BPR projects, it is feasible for salt enterprise restructuring projects.

    应用项目网络技术制订BPR进度计划,以计划控制BPR项目进度,对盐业企业重组项目是可行的。

    youdao

  • Solutions of data communication project management are summarized in team organization, project control, quality control, progress follow-up as well as cost handling.

    归纳了数据通信项目在项目团队组织、项目整体控制、质量、进度、成本控制方面的一些解决方法。

    youdao

  • Take charge of project schedule, quality, progress and accomplishment, lay down, adjust and control the operation of the project.

    负责项目的工作计划进度、质量、进度和目标完成情况,具体制定、调整和控制项目运行;

    youdao

  • Take charge of project schedule, quality, progress and accomplishment, lay down, adjust and control the operation of the project.

    负责项目的工作计划进度、质量、进度和目标完成情况,具体制定、调整和控制项目运行;