• The Risk List is produced by the Identify and Assess Risks task of the Project Management discipline (Figure 2).

    风险列表项目管理规程鉴别估计风险任务生成2)。

    youdao

  • Figure 1 also illustrates a typical program management structure, which is more complex than that of a project.

    1阐明了典型规划管理组织一个项目的管理组织要复杂

    youdao

  • Figure 1 shows an example of colorized project artifacts.

    1展示了上色的项目工件实例

    youdao

  • This list will represent all of the requirements in the project in their hierarchical structure, including folders (see Figure 10).

    列表将会展示项目所有需求分层结构包括文件夹如图10所示)。

    youdao

  • In those cases the view of the project illustrated in Figure 1-4 never occurred, because there was no objective evidence that any progress was being made on the completed project.

    这些案例中显示1 -4中的项目视图从未发生过因为并不存在任何客观凭证以证实这种已完成的的项目做出任何进展

    youdao

  • Our initial project structure is complete. The J2EE view of your workspace should look like Figure 3.

    完成初始项目结构之后,工作台中的J2EE视图应该看起来如图3所示。

    youdao

  • Figure shows template for a project outside of governance rules.

    图中显示出对于治理规则之外项目模板

    youdao

  • Along with selecting the project and process name, there is a new option to select the goal of the modeling project: either documentation or automation, as shown in Figure 6.

    除了选择项目流程名称以外还有一个用于选择建模项目目标选项文档记录自动化,如图6所示。

    youdao

  • The values for the fields in the wizard (Figure 9) depend on the intended functionality of the project.

    这个向导(9)取决于这个项目想要功能特性

    youdao

  • So the typical IT project is task-based and operates in the upper half of Figure 1.

    因此典型IT项目基于任务的,并且处于 1上半部分中。

    youdao

  • The project will display with all elements of the WBS displayed (see Figure 31).

    项目显示所有WBS元素(参见31)。

    youdao

  • This tab group consists of multiple tabs, and the visible tab in Figure 1 accepts the names of the executable to be debugged and its project.

    这个选项包含有多个选项卡,1可见选项卡接受将要调试的可执行文件和项目名称

    youdao

  • As mentioned above, the ability to design an iteration plan that removes risk so that the project tracks the curve shown in Figure 6 is a hallmark of an effective project manager.

    上面所提到设计去除风险以便项目遵从6中所曲线迭代计划能力检验高效的项目经理标志

    youdao

  • Once you select the list of projects and click on the OK button, the Existing project text box will be updated with the list of projects selected by the user as shown in Figure 14 below.

    一旦选择项目列表点击OK按钮,那么已存在项目文本随着用户选择的项目列表而变化,如图 14 所示。

    youdao

  • You can also select the entire folder or project (where project is the highest level), and all of the requirements in that folder or project will be selected for import automatically (see Figure 13).

    能够选中整个文件夹或者项目(此处项目最高级的),该文件夹项目中的所有需求都将自动导入(参见13)。

    youdao

  • Figure 8: a plethora of materials is used for identification and organizing of process and project data.

    8用于确认组织过程项目数据过多材料

    youdao

  • In the example shown in Figure 6, the JAR file was included in the tools directory of the project.

    6示例中,JAR文件包含项目工具目录下

    youdao

  • Although RUP lists project management as one of its nine core disciplines (see Figure 2 below), organizations using RUP may still benefit from having an anchoring project management framework.

    尽管RUP项目管理列为九个核心规程之一(参见下面2),但是使用RUP的组织仍旧得益于使用固定的项目管理框架

    youdao

  • Each of these portlets contains information on and about the RequisitePro project (see Figure 20).

    一个portlets包含关于RequisitePro项目信息(参见20)。

    youdao

  • Create a new project called FabricRoleExt of type Ontology Extension, as shown in Figure 19, and associate it with the ACME organization or other desired organization.

    创建一个名为FabricRoleExt项目,其类型为OntologyExtension如图19所示,ACME组织其他所需的组织关联起来。

    youdao

  • In the Timesheets view in Figure 17, Rene can keep track of time spent on various project tasks.

    17所示工时单视图Rene可以跟踪各种不同项目任务所花费时间

    youdao

  • This imports the WSDL file and also creates the interface file and associated stub files in the SRC directory of the Web project, as shown in Figure 29.

    导入WSDL文件Web项目src目录创建接口文件相关联存根文件如图29中所示。

    youdao

  • Figure 1 shows the layout of a sample Eclipse project.

    1显示一个示例eclipse项目布局

    youdao

  • Name the project order and add a blank package called order Model to the order project on the second page of the wizard. (see Figure 1).

    命名项目order向导第二页面排序项目添加一个名为orderModel空白(见于1)。

    youdao

  • Figure 2 shows the structure of the project files within Eclipse.

    2显示Eclipse项目文件结构

    youdao

  • The Project Explorer view in Figure 7 shows a list of the parts of the OrderProcessor provider and a method (behavior) for each provided operation.

    7中的Project Explorer视图显示OrderProcessor提供商部分列表以及一个提供的操作的方法(行为)。

    youdao

  • Assign your new style to a user in the userDirectory.properties file within the resources folder of the command bean project, as shown in Figure 3.

    样式分配commandbean项目resources文件夹下userdirectory .propertie文件中的一个用户如图3所示。

    youdao

  • The structure of the Web project is shown in Figure 17. The SimpleApp shown in the Project Explorer view is split up into these sections

    Web工程结构如图17所示

    youdao

  • The easiest way for you to figure out which documents have been added or removed is to look at the version tree of the RequisitePro project folder, as shown in figure 18.

    找出一个文件添加的,哪一个文件被删除的,简单方法查看RequisitePro项目文件夹中的版本树状结构如图18所

    youdao

  • The project tree in Figure 2 illustrates the cumulative set of jars in a Seam project.

    2中的项目说明一个Seam项目中的jar集合

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定