'Progress' in modern project management is an integrated indicator combining systematically the engineering task, time limit, cost and resources and showing overall the construction status.
现代项目管理中的进度是一个综合的指标,它将施工项目任务、工期、成本、资源有机地结合起来,能全面反映项目的施工状况。
Passenger volume forecast is a key indicator to weigh the basic project economic cost and economic benefit after a project puts into service.
客运量预测是衡量建设项目经济成本、预测建设项目投入运营后经济效益的关键性指标。
And in accordance with the characteristics of software projects and project staff, developed an evaluation system based on the key performance indicator.
并根据软件项目的特性和项目人员的特性,制定出项目绩效考核的关键指标考核体系。
Current performance is best indicator of future performance and therefore using trend data it is possible to forecast cost or schedule overruns at quite an early stage in a project.
项目当前的执行情况是项目未来执行情况最好的指示器,因此在项目较早期使用项目动态数据可能预测项目的成本和时间安排是否超出预期。
A final column in Table 5-1 indicates the amount over or under the budget for each category. This column is an indicator of the extent of variance from the project budget;
表5-1的最后一栏显示了每一项次预算超支或勤俭的数值,这一栏也是预算偏差的唆使器。
A final column in Table 5-1 indicates the amount over or under the budget for each category. This column is an indicator of the extent of variance from the project budget;
表5-1的最后一栏显示了每一项次预算超支或勤俭的数值,这一栏也是预算偏差的唆使器。