• 'Progress' in modern project management is an integrated indicator combining systematically the engineering task, time limit, cost and resources and showing overall the construction status.

    现代项目管理中的进度一个综合指标,它施工项目任务工期成本资源有机地结合起来,能全面反映项目的施工状况。

    youdao

  • Passenger volume forecast is a key indicator to weigh the basic project economic cost and economic benefit after a project puts into service.

    客运量预测衡量建设项目经济成本、预测建设项目投入运营经济效益关键性指标

    youdao

  • World Health Organization, there are an indicator, if the treatment group a year later there are 70% to 90% remain in the stage of the medication, it shows that the treatment success of the project.

    世界卫生组织指标如果治疗人群之后还有70%90%保持吃药阶段说明治疗项目成功

    youdao

  • And in accordance with the characteristics of software projects and project staff, developed an evaluation system based on the key performance indicator.

    根据软件项目特性项目人员特性,制定出项目绩效考核关键指标考核体系

    youdao

  • Current performance is best indicator of future performance and therefore using trend data it is possible to forecast cost or schedule overruns at quite an early stage in a project.

    项目当前执行情况项目未来执行情况最好指示器因此项目早期使用项目动态数据可能预测项目的成本时间安排是否超出预期。

    youdao

  • This article through after the indicator of which was established, USES the project to evaluate, and also provide the sample for the enterprise.

    本文通过建立评价指标体系,结合具体的项目进行分析评价,其他电力企业技改项目的后评价提供一个可参考的样本

    youdao

  • A final column in Table 5-1 indicates the amount over or under the budget for each category. This column is an indicator of the extent of variance from the project budget;

    5-1最后显示每一项次预算超支勤俭数值,一栏也是预算偏差唆使器

    youdao

  • A final column in Table 5-1 indicates the amount over or under the budget for each category. This column is an indicator of the extent of variance from the project budget;

    5-1最后显示每一项次预算超支勤俭数值,一栏也是预算偏差唆使器

    youdao