Post project follow up with Canadian colleagues in providing reports and post project support;
负责项目的后序工作,包括协助提供检测报告及售后技术支持;
It is important to follow up any initial meeting to completely identify all business requirements before you invest too much time and resources into the project.
在向项目投入过多时间和资源之前,遵循所有初始会议以完整地识别所有的业务需求是十分重要的。
The project succeeded in screening 346 sites with potential chemical contamination risks and identifying 58 priority pollution sources for follow-up mitigation actions.
通过对346个具有潜在化学污染风险的点进行筛查,这一全球环境基金项目识别出58个重点污染源作为采取后续措施的重点。
Download the sample application from the "Download section of this article, and follow the instructions in README."txt to set up the sample and to import the project into your Eclipse workspace.
从本文的“下载”部分可以下载此示例应用程序,继而跟随README. txt的指导来设置该示例并将此项目导入到Eclipse工作区。
Its predecessor is the follow-up education activities. The activities of the financial management division project holder.
其前身是启宣文化的后续教育活动。该活动面向财务管理师项目的持证人。
In the design phase of a project, the type selection and collocation of embedded instruments is an important job, which influences to a large extent the follow-up work.
在工程设计阶段,埋设仪器的选型和布置设计是监测设计中的一项重要工作,仪器选型是否正确对后续工作的成败有很大影响。
To avoid losses and waste and to prevent the "uncompleted" works, it should properly arrange the follow-up capitals of the project under construction.
为避免损失浪费,防止出现“半拉子”工程,应当妥善安排在建项目的后续资金。
The hilarious follow-up to The Rosie Project, one of the best novels I've read in ages.
这本《罗茜计划》的搞笑后续是我这几年读过的最棒的小说。
In charge of technical support to tooling manufacturer and follow up project development process of supplier. Assist to solve the technical problem in manufacturing procedure.
负责对工装制造供应商提供技术支持,跟踪供应商的项目开发进度,协助解决加工过程中的技术问题。
Strong implementation, be able to follow up the project and make adjustment quickly and properly according to situation.
较强的执行力,懂得跟进项目执行过程,并能根据情况快速、正确做出调整。
Assist in setting up the project cost follow-up report, according to the projects financial management, prepare the monthly analysis for variation.
根据项目财务管理要求,协助部门经理建立项目成本跟踪报告,按月分析,报告差异。
The new project aims both to guide scientists towards more disease-associated regions, and to hasten much of the costly follow-up research.
新项目打算旨在引导科学家向更多与疾病相关的基因区域研究和加速许多昂贵的跟踪研究的进展。
They coordinate all aspects of the project and are responsible for follow-up and evaluation after the fact.
他们协调项目的所有方面,并负责跟踪和评估项目运营后的成果。
Audit after the event is the key link of follow-up audit, including the acceptance test of completion of a project and the examining and approving of the cost of house repairing engineering.
房屋修缮工程审计是高校内部审计的重要内容之一,而跟踪审计又是高校房屋修缮工程审计的基本方法。
Chapter six according to the present study, summarizes the main work of this project research and achievements, and put forward a vision for reflection and follow-up study.
第六章根据目前的研究情况,总结了本项目研究的主要工作及成果,并对其中的一些问题提出了反思及后续研究的展望。
Manage the project, including but not limited to review supplier's design, follow up the schedule, FAT and installation.
管理项目,包含但不限于方案确认,项目进度跟进以及工厂接收测试,设备安装等。
Follow up Translation status of customer documents and other technical documents (ITP, ts, TR, PAI, FAI, etc.) required by project to due dates.
跟踪用户文件以及其他技术文件(ITP,TS,TR,PAI,FAI等)的翻译状态和项目要求的到期日。
Select, visit and follow up the key potential customer & project to help sales team do the sales; 4.
选择,访问和跟进主要潜在的客户和项目,以帮助销售团队完成销售任务。
The fifth chapters recommended the follow-up work of harmonic project -the development of active power filter and the research of electric power management based on the techniques of network.
第五章简要介绍了谐波课题的后续研究工作——综合有源滤波系统的开发以及基于网络技术管理的电力系统的研究。
Organize project files and keep tracks on changes order, follow up with consultants; make sure the drawing is adhesive to the design.
整理项目档案及文件,追踪所有设计变更相关文件,并确认其正确性。
The essay has selected LNG GOLD MINE project to do empirical research on the basis of follow-up investigation.
本文选取了LNG GOLDMINE黄金地质勘查项目,在跟踪调查的基础上进行实证研究。
Schedule and monitor project program activity to achieve an on-time result including follow-up with related departments or external subcontractors to ensure timely response.
根据项目具体工作安排,跟踪监控内部相关部门和外部分包商以使得项目各工作及时进行。
Follow up the project; coordinate the relationship among related design institute, Party a and system integrator, etc.
跟踪项目进展,协调相关设计院、甲方、系统集成商等关系。
Keep search for best supplier, continue cost reduction New material developing Urgent order follow up and emergency coordination Project assigned follow up.
筛选优秀供应商,降低成本;新样品需求的开发跟进;处理紧急订单和其它突发状况;
Consult with project engineer to see whether material can be decided after review, if not, follow up project engineer to decide new material;
评审通过后,应与项目工程师确认是否可以定料,若不可,则跟进项目工程师的确认;
Review and check sales contract, recognize the sales. Project cash inflow follow up. Computation of commission and consulting fee.
负责销售合同的审核和保管。及时准确地确认收入,负责项目回款情况的跟踪。负责计算销售佣金和运费,咨询费。
Engineering Follow-up auditing, as a new method, has received good results in the project control, but also greatly increases the audit cost.
工程跟踪审计这一新生的方法在工程项目控制中收到了很好的效果,但是也大大的增加了审计成本。
Engineering Follow-up auditing, as a new method, has received good results in the project control, but also greatly increases the audit cost.
工程跟踪审计这一新生的方法在工程项目控制中收到了很好的效果,但是也大大的增加了审计成本。
应用推荐