The fundamental implementation procedure of petrochemical engineering project normally is divided into 8 phases.
石化工程项目实施的基本程序通常划分为8个阶段。
The crafts keys and project quality check procedure of the flexible waterproof layer in road and bridge engineering are summarized.
总结出柔性防水层在桥梁施工中的工艺操作要点和工程质量检测程序。
The emulation results show that the actual working situation can be vividly demonstrated in project engineering stage to visualize the abstract technological issues of each procedure on the screen.
仿真结果表明,在工程设计阶段就可以展示工作时的真实场景,使抽象的技术问题形象化。
The emulation results show that the actual working situation can be vividly demonstrated in project engineering stage to visualize the abstract technological issues of each procedure on the screen.
仿真结果表明,在工程设计阶段就可以展示工作时的真实场景,使抽象的技术问题形象化。
应用推荐