• The DOE would oversee FutureGen and pay 74% of the costs; a group of energy companies, called the FutureGen Alliance, would pay for the rest and design, build and manage the project.

    能源部监管未来发电项目出资74%,一些能源公司组成未来发电联盟,将负责另外的资金,以及项目的设计建造管理

    youdao

  • The DOE would oversee Future Gen and pay 74% of the costs; a group of energy companies, called the Future Gen Alliance, would pay for the rest and design, build and manage the project.

    美国能源部原计划监管FutureGen并且支付74%费用;由几家能源公司组成的Future Gen联盟支付其余的资金设计建造管理项目。

    youdao

  • Learn how the DOE intend to how we intend to operate the project and how they will reach their ultimate goal of 1 GW deployed of new CSP technology.

    了解如何能源部打算我们打算如何运作项目它们如何实现最终目标1千瓦新的CSP技术部署

    youdao

  • Negotiations between the selected companies and DOE will begin immediately to determine final project plans and precise funding levels.

    美国能源部选出公司谈判立即开始决定最终项目计划确切资助标准

    youdao

  • Further study shows that DOE and project owners′ citation of industry standard SL16-95 (revised edition) to verify effective power issues was wrong and ineffective.

    进一步研究表明DOE项目业主方面引述行业标准SL16—95修订版有效电量问题进行证明错误无效的。

    youdao

  • The project will monitor injected CO2 at and below the surface to ensure that storage is safe and permanent, DOE said.

    项目表面表面之下监测被注入二氧化碳确保二氧化碳的存贮安全和永久的,DOE说。

    youdao

  • The project will monitor injected CO2 at and below the surface to ensure that storage is safe and permanent, DOE said.

    项目表面表面之下监测被注入二氧化碳确保二氧化碳的存贮安全和永久的,DOE说。